Laserfiche WebLink
r , <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1373 Sherman St., Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />RA x: 303 932-8106 <br />MINING PERMIT - COAL <br />TECHNICAL REVISION DECISION FORM <br />o~~o <br />NP °. <br />r'_ ~ (1 <br />i ~.+\ i? <br />} l`L~.y <br />~ r846 ~ <br />Roy Romer. <br />Governor <br />Michael B. Long, <br />Division Duetlor <br />The Mined Land Reclamation Division, Department of Natural Resources, State of <br />Colorado has proposed the decision stated below. The decision will become <br />effective upon the termination of the ten (10) day public comment period, <br />pursuant to Rule 2.08.4(5)(b)(ii). <br />Permit No.: C-81-038 Technical Revision No.: 017 <br />Submittal Date: February 18, 1992 Decision Date: March 27, 1992 <br />Revision Decision Type: Approved <br />Minel: Orchard Valley Mine <br />Permittee: Cyprus Orchard Valley Coal Co. <br />Description of Revision: Panel B Mine Plan Modification <br />Change in Bond Amount: No Change <br />Area Changes <br />Disturbed Area (+/-) .0 Ac. Max. Disturbed Area (+/-) .0 Ac. <br />Affected Area (+/-) .0 Ac. Permit Area (+/-) .0 Ac. <br />Federal Land (+/-) .0 Ac. State Land (+/-) .0 Ac. Private Land (+/-) .0 Ac. <br />Revised Application Pages 2.05 pp. 1, la, 2, 142, 157, 159-161 <br />Revised Maps 2-5 <br />PERMITTEE2 MINED LAND RECLAMATION DIVISION <br />Authorized Representative <br />DATE: <br />COL DO DEPARTMENT F NATURAL RESOURCES <br />i <br />~ L~LC~GLC <br />Authorized Representative <br />DATE: March 27, 1992 <br />Stipulations Attached Yes No X <br />lIf this action pertains to a federal mine <br />permittee must send copies of the approved <br />listed on the Federal Agency Mailing List. <br />the revision must be sent certified mail t <br />Avenue SW, Albuquerque, New Mexico 87102. <br />all copies have been sent. <br />(coal or surface ownership) the <br />technical revision to the agencies <br />For non-Federal mines 1 copy of <br />~ OSM at Suite 310, 625 Silver <br />The project may not proceed until <br />2Signature is required if stipulations are attached. <br />SSS/bjw/6541G <br />