Laserfiche WebLink
~ -~ =Golder <br />Associates <br />May 25, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, CO 80860 <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />RE: Summary No. 3: May 9 through May 22, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Deaz Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of May 9 through May <br />22, 2004. <br />• The weather during this reporting period was cleaz to cloudy. Approximate daytime low <br />temperatures ranged from 24° F to 48° F, and highs ranged from 45° F to 74° F. Weather <br />observations were made on fourteen days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nc <br />construction. Ames conducted Phase Nc construction activities on eleven days of this fourteen-day <br />reporting period (May 10 through May 14, and May 16 through May 22, 2004). Poly-Flex conducted <br />Phase Nc construction activities on two days of this fourteen-day reporting period (May 21 and 22, <br />2004). <br />Phase Nc <br />Ames resumed contouring and compaction of subgrade in prepazation for soil liner fill (SLF) placement <br />in the Phase Nc Ore Storage Area (OSA). Ames loaded, hauled, and placed structural fill (SF) within <br />the Phase Nc area footprint during slope re-contouring. <br />Ames continued construction of the Phase Nc Leak Detection Trench (LDT) within Phase Nc along <br />the west section of the VLF on Chicken Hawk Hill. Ames constricted approximately 1020 feet of <br />LDT. <br />• <br />Phase IVc 03 May 9-May 22 2004 043-2170 <br />