My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95502
DRMS
>
Back File Migration
>
Revision
>
REV95502
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:31 AM
Creation date
11/21/2007 11:50:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
Revision
Doc Date
9/15/1982
Doc Name
Interim site plan
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Area 19b (Sta. 153 to 180) covers 35 acres, of which 3 acres are made up of <br />road surface which will be stabilized by dust suppressants as necessary <br />during the 1982 - 1984 period. The remaining 35 acres consists mainly of <br />the excess fill existing below the roadway at the base of Davis Gulch <br />Falls. This area will be regraded to remove angle of repose slopes to the <br />extent possible. It is Exxon's intent to regrade this area as flat as <br />practicable within the framework of the site needs for potential future <br />development. The final configuration of this slope will depend on the <br />results of currently-in-progress engineering studies. It will be necessary <br />to install an armored channel on this fill and perform some channel work at <br />the base of this fill. The hydrologic issues at this site are discussed in <br />more detail in Appendix G.`/ <br />• Area 19c (Plant Access Road) consists of 26 acres, of which 22 acres are <br /> rock cliffs which are considered finished. The remaining 4 acres are made <br />up of road surface which will be stabilized using dust suppressants as <br />necessary during the 1982 - 1984 period. <br />Area 19d (Sta. 280 to 355) consists of 30 acres, of which 11 acres are rock <br />cliffs that are considered finished. Ten acres will be regraded and top- <br />soil respread where appropriate and permanently revegetated in Fall 1982. <br />The remaining 9 acres make up the Plant Access Road surface that will be <br />stabilized using dust suppressants as necessary during the 1982 - 1984 <br />period. <br />• MAS:dp <br />
The URL can be used to link to this page
Your browser does not support the video tag.