My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95434
DRMS
>
Back File Migration
>
Revision
>
REV95434
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:29 AM
Creation date
11/21/2007 11:49:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983175
IBM Index Class Name
Revision
Doc Date
9/12/1996
Doc Name
INTERIM RECLAMATION BOND ALAMOSA PIT 2 PN M-83-175
From
DMG
To
SOUTHWEST READY-MIX INC
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECLAMATION COST SIMURY cont'd <br />K. PORTAL/:iHAFT SEALING <br />Task No.~ Task Description <br />i <br />sheet 4 of 4 <br />Lost (S) <br />__________.._ I _____..______ <br />Subtotal (K ): <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ CosC (f) <br />________ I __~_.__.,_._~_.~._~_..__________________~_.,_ I ..___.,______ <br />Subtotal (1 ): <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description ~ Cost (f) <br />_.._.____I__________________________________________________I_____.______ <br />8 ~ Purchase Mater to Replace Evaporative Losses ~ f80, 000 <br />Demob [ion <br />6 ~ Seeding ~ f19, 832 <br />Fencing <br />7 ~ Mob/Demob ~ 57,921 <br />Subtotal (M): 5707,753 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): f286, 843 <br />Ii. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (f) <br />_.__~__I.____..____________________~______________________I_________.__ <br />7. ~ Public Liability Insurance.... 1.550% of dir. ~ f4,446 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ f2, 797 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ (28,684 <br />4. ~ Job Superi n[endent.. <br />Subtotal (A): f35 ,927 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 5322,770 <br />B. DNG PROJECT ADMINISTRATION EKPENSES <br />Item No.~ Item Description ~ Cost (S) <br />________I_________________________________________~___.____I_~._______ <br />1. ~ Minerals Program Admin. Fee e[ 5.00% of cntr.~ f16, 139 <br />NET IND IRE[T COST PERCENTAGE: 18.75% Subtotal (B): f16, 739 <br />__________ ______ _____ <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): f52, 066 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus irdirett costs): 5338,909 <br />
The URL can be used to link to this page
Your browser does not support the video tag.