Laserfiche WebLink
Mr. W. D. Hester - 2 - June 7, 1985 <br />2. C-JD-7 Pit File No. M-79-94 <br />a. The date the Temporary Cessation commenced at this site is April 2, <br />1981. This operation is in the first five-year phase of temporary <br />cessation; an extension of such is not required until 1986. <br />b. Is the spoil-pile binder minimizing erosion from the pile? <br />3. C-SR-13A File No. M-77-311 <br />a. Was the cribbing mentioned in the permit proposed, or had it been <br />constructed? <br />b. If constructed, how will it be reclaimed? <br />4. C-SM-18 File No. M-78-116 <br />a. Was the evaporation pond ever constructed? <br />b. Has erosion resulted from the water issuing from the mine? <br />c. If so, please provide erosion mitigation plans. <br />5. a. Please provide a discussion addressing the extent of disturbance <br />and extent and condition of reclamation at each site for which <br />temporary cessation extension is requested. <br />b. Please provide a map illustrating the extent of disturbance and <br />reclamation at each site for which temporary cessation extension is <br />requested. <br />6. The maps requiring submittal with regular operation annual reports and <br />fees have not been provided as of this date. Please provide a map with <br />the future submittals of Annual Reports/Fees (See Mineral Rules and <br />Regulations 2.4). <br />If you have any questions, please do not hesitate to contact me. <br />Sincerely, <br />~ , <br />C~,ru LCD 7~L '/1 'L L['C ~ <br />Camille M. Farrell <br />Reclamation Specialist <br />CMF/ljc <br />1117E <br />