My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95415
DRMS
>
Back File Migration
>
Revision
>
REV95415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:28 AM
Creation date
11/21/2007 11:49:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977325
IBM Index Class Name
Revision
Doc Date
10/10/2003
Doc Name
Cost Summary Form
From
DMG
To
Summit Pressed Brick & Tile
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinst Software <br />COST SUMMARY FORM <br />nvacai r rvcn ~ rrrve+r wn / <br />Date : 10-Oct-2003 <br />User: JD1 <br />Permitorjob no.: M-1977-325 <br />Abbreviation : none <br />Filename : M325-000 <br />Agency or organization name :DMG <br />Permitorjob action :Final reclamation <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Grade entire disturbed area dozer 1 25.81 $3,195 <br />002 -Replace topsoil scraped 1 25.8 $3,676 <br />003 -Reseed 8.4 acres revege 1 40.0 $6,380 <br />004 -mob/demob equipment mobilize 2 6.0 $1,820 <br />'inGudes inflation factor adjustment of: NA <br />SUBTOTALS: 97.7 <br />TOTAL DIRECT COST' <br />:l:l GUJlS <br />OVERHEAD AND PROFIT - Llabilily IfISUfanCe : 1.55 % Of direct total = $234 <br />Performance bond : 1.05 % of direct total = $158 <br />Job superintendent : NA' NA NA total = NA <br />Profit: 10.00 %ofdirect total= $1,507 <br />' not required (or eqp. operator selves es super) TOTAL O 8 P = $1, 899 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $16,970 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contracUbid preparation : 4.25 % of Intr. NA total = $721 <br />Reclamation management andlor administration : 5.00 % of cntr. NA total = $848 <br />CONTINGENCY- NA` NA total= NA <br />'contingencies accounted (oral task level TOTAL INDIRECT COST = $3,469 <br />TOTAL BOND AMOUNT (direct + indirect) _ $18,540 <br />s~-dam ~ <br />r3Rl~-< ~- r fLe <br />Site :Cherokee Clay Mine <br />State :Colorado <br />County :Fremont <br />
The URL can be used to link to this page
Your browser does not support the video tag.