My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95401
DRMS
>
Back File Migration
>
Revision
>
REV95401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:27 AM
Creation date
11/21/2007 11:49:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
7/14/2004
Doc Name
3rd Adequacy Review Letter
From
DMG
To
Seneca Coal Company
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Roy Kazo <br />Seneca Coal Company <br />7/14/2004 <br />Page 4 <br />Comment 2. <br />Response accepted. <br />Comment 3. <br />Tab 20 has been updated as requested. The Division has noted some <br />discrepancies between the approved Post-Mining Topography Map and the <br />proposed Post-Mining Topography Map (Exhibit 20-2). For instance at a location <br />to the northeast of I-I' in the North Valora Pit, the slope on the approved Exhibit <br />20-2 is 4h: lv, whereas on the proposed revised Exhibit 20-2 the slope has <br />increased to 3h: lv in the same location. This location has been final graded, <br />topsoiled, and seeded as part of the 2001-2002 polygon area associated with CO- <br />2003-012. The Division is concerned that there may be other locations where the <br />approved post mine topography differs from what is actually on the ground. What <br />aze the quality control procedures utilized by SCC to ensure that the final grade is <br />consistent with the approved post mining topography? Other changes were noted <br />on the revised Post-Mining Topography Map (Exhibit 20-2). In the same location <br />noted above, post-mining cross-section I-I' has changed in location and length. <br />Likewise cross-section G-G' has also changed from the approved Exhibit 20-2. <br />Please update these changes on Exhibit 20-2A Pre Mining & Post Mining Cross- <br />Sections Map. <br />As indicated in the attached memo from Byron Walker, slopes of over 3 <br />horizontal to 1 vertical appeaz to be subject to a high probability of failure. This <br />is evident in two locations at the Yoast Mine. One location is the 2003 variance <br />azea where the slope was measured to be 1 vertical to 1.7 horizontal in the vicinity <br />of a developing crack. Another location is the slide above Pond 012. A slope of <br />1 vertical to 2.8 horizontal was measured in a small portion of the slide. To <br />ensure compliance with permit conditions and to ensure stability of the final <br />graded slopes, please place spoil material no steeper than 3 horizontal to 1 vertical <br />at the above-referenced locations. This includes the slide area above and to the <br />east of Pond 012 and the 2003 variance azea encompassing the location of the <br />proposed haul road. Upon careful review of the proposed Post-Mining <br />Topography Map and Backfilling and Grading Plan (Exhibits 20-2 and 19-1A), it <br />appeazs that the proposed slope above and to the east of Pond 012 ranges from <br />2.3h:1v to 3.2h:1 v and in the 2003 vaziance area in the location of the haul road <br />the slope is proposed at 2.8h:1 v. Based on the above findings, the Division is <br />requesting that SCC revise all appropriate maps and exhibits to reflect slopes no <br />steeper than 3 horizontal to 1 vertical in the areas above and east of Pond 012 and <br />in the location of the proposed haul road at the 2003 variance area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.