Laserfiche WebLink
<br />' TABLE OF CONTENTS (Continued) <br />1 <br />' Figure 1 - Pre-Mining Monitoring System Location Map <br /> Figure 2 - Pre-Mining and Mining Schematic Cross-Sections Through the West Pit <br /> Figure 3 - Pre-Mining Surface Geology <br /> Figure 4 - Post-Mining Cross-Sections Through the West Pit <br /> Figure 5 - Pre-Mining Potential Surface and Water Quality Data <br />' Figure 6 - Current Water Quality Monitoring Station Locations <br /> Figure 7 - Conceptual Flow Path from West Pit to Rito Seco Alluvium <br />' Figure 8 - Proposed Additions to West Pit Monitoring Well System <br /> Figure 9 - Typical Well Completion Details <br />' Figure 10- Interim Measures <br /> Figure 11- Schedule Timeline <br /> <br /> Table 1 - Summary of Monitoring Well Data <br />' Table 2 - <br />T <br />bl <br />3 Summary of Proposed Monitoring Well Installations <br />d W <br />li <br />M <br />i <br />i <br />TR <br />15 R <br />G <br />P <br />Pl <br /> a <br />e <br />- roun <br />ater Qua <br />ty <br />on <br />tor <br />arameters, <br />- <br />ng <br />esponse <br />an <br /> Table 4 - Surface Water Quality Monitoring Parameters, TR-15 Response Plan <br />' <br /> Appendix A - Select Surface and Ground Water Quality Data <br /> Appendix B - Geochimica, Inc. Interpretation of October 1998 Pit-Backfill Water Quality <br /> <br /> <br /> <br /> <br /> <br /> _ii_ <br /> <br />