Laserfiche WebLink
iii iiiiiiiiniiiiii <br />STATE OF COLORADO <br />DIVISION OE MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1111 Sherman St., Room 215 <br />Denver, CO 80203 <br />Phone: 13071 866-3567 <br />FA7(: 13071 8 3 2-81 06 <br />November 22, 1993 <br />Mr. Allen Weaver <br />Mine Engineer <br />Energy Fuels Mining Company <br />P.O. Box 449 <br />Florence, CO 81226 <br />RE: Adequacy Review, TR-07, Energy Fuels Mining Company, <br />Raton Creek Mine, Permit No. C-82-055. <br />Dear Mr. Weaver: <br />i~ pF CO~~ <br />~~° I <br />Roy Romer <br />Governor <br />M¢hael B. Long <br />Drvieion Director <br />The Division has reviewed your adequacy response dated <br />November 19, 1993 and has the following questions or comments. <br />1. The cover letter of your response package states that a map <br />of the Burlington Northern Loadout area was included. <br />However, the Division did not receive this map. Please re- <br />submit a map of the Burlington Northern Loadout area showing <br />how EFMC intends to treat runoff. <br />2. The Division requires a description of the silt fence and <br />installation procedure. <br />3. The Division requires a statement from a PE stating that <br />EFMC's proposed plan for sediment control, utilizing a silt <br />fence, will satisfy sediment control requirements. <br />4. The Division requires a commitment from EFMC to sample <br />discharge. <br />If I can be of further service, please contact me. <br />Sincerely, <br />;,11,c%~-tip ~ ~~,~~ <br />Wallace H. Erickson <br />Environmental Protection Intern <br />cc: Tom Leidich, Terra Matrix <br />m:\oss\scm\weaver.whe <br />