My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95329
DRMS
>
Back File Migration
>
Revision
>
REV95329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:25 AM
Creation date
11/21/2007 11:48:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063
IBM Index Class Name
Revision
Doc Date
11/6/1992
Doc Name
EASTSIDE BOND ESTIMATE FROM MIDTERM REVIEW C-84-063
From
DMG
To
EASTSIDE COAL CO
Type & Sequence
MT2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE nF ~ni nIZ~DO <br />DIVISION OF MINERALS AND GEOLOGY <br />~; = ro <br />Department of Natural Resources ~ of ~~ <br />Ne <br />1313 Sherman Si., Room 215 .~~ ~ R . i <br />Denver, CO 80.03 <br />Phone: (3071 8663567 rays ' <br />FA%: (}0}I 83?-8106 Rov Ro~+er <br />Governor <br />Michae~B. Long <br />D rvi sion DIleC10! <br />DATE: November 6, 1992 <br />T0: Shawn Smith <br />Larry Routten <br />FROM: Erica Crosby <br />RE: Eastside Bond Estimate C-84-063 <br />I have completed the preliminary cost estimate for the Eastside <br />Coal Mine. I reviewed the Division's calculations preformed in <br />June of 1989, as well as reading the operations plan of the <br />Eastside permit. The initial estimate done in June of 1989 came to <br />a total of $40,000. This estimate does not include the proposed <br />operation plan of a waste disposal area, and a new office facility <br />area. The estimate preformed at that time also left out several <br />structures such a powerlines, culverts, and minor facilities that <br />are on site. The bond estimate that I calculated came to $110,642. <br />This figure represents the reclamation for the existing area as <br />well as proposed structures, facilities and dirt moving. I have <br />broken down the following tasks as to what is out there and what is <br />proposed under the mine permit. The breakdown is as follows: <br />Existing <br />(1) Backfilling Portals <br />(3) Regrade Surface Fac. <br />(7) Rip Facility Area <br />(8) Rip Access Road <br />(10)Regrade Main Road <br />(12)Backfill Pond SDP-1 <br />(14)Clean Water Ditch <br />(15)COllection Ditch <br />(16)Topsoil Slope <br />(18)Install Bulkheads <br />(19)Seal Monitoring Well <br />(20)Structural Demo. <br />(21)Revegetation <br />(22)MOB/DEMOB <br />(23)Net Hours <br />........................ <br />Direct/indirect 12.525 $7,068 <br />Contract Prep fees 4.25 $3,017 <br />TOTAL ....................$74,015 <br />Proposed <br />(2) Regrade Mine Site <br />(4) Finish Grading Waste <br />(5) Remove Coal Waste <br />(6) Spread Non-Toxic <br />(9) Rip Waste Road <br />(11)Regrade Waste Road <br />(13)Backfill Pond SDP-2 <br />(17)Cover Facility Soil <br />(20)Structural Demo. <br />(22)Net Hours <br />$2,763 <br />$4,557 <br />$1,230 <br />$6,908 <br />$48 <br />$349 <br />$3,392 <br />$1,845 <br />$3,625 <br />$7,302 <br />.........................$32,019 <br />$2,091 <br />$2,030 <br />$403 <br />$161 <br />$2,069 <br />$3,392 <br />$140 <br />$105 <br />$1,268 <br />$14,385 <br />$916 <br />$23,111 <br />$2,438 <br />$3,923 <br />$7,500 <br />$63,932 <br />Direct/indirect $3,096 <br />Contract Prep fees 4.25 $1,492 <br />TOTAL ....................$36,610 <br />
The URL can be used to link to this page
Your browser does not support the video tag.