My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95322
DRMS
>
Back File Migration
>
Revision
>
REV95322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:24 AM
Creation date
11/21/2007 11:48:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986102
IBM Index Class Name
Revision
Doc Date
3/23/1994
Doc Name
RECLAMATION COST SUMMARY FORE
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
@BCLANATION COST 9UNXARV cont'd • sheet 4 0[ 4 • <br />H. PORTAL/9RAFT BRACING <br />Task No.; Task Description Cost (SI <br />I ; Cate 5 Portals 56,000 <br />, <br />........:..................................................:............ <br />Subtotal (HI: 56,000 <br />L. DRILL BOLE/MOl1ITORINC NHLL SBALINC <br />Task No.; Task Description ; Cost (51 <br />, <br />; ' <br />........:......................................Subtotal.iLi:............ <br />------------ <br />N. NISCBLLANBOU3 BHCLANATION TASHS <br />Task No.; Task Description Cost (51 <br />; <br />; ' <br />Structural Demolitiom <br />2 ; 6evegetation (2,384 <br />; Fencing <br />NobilitatiomlDemobilieation <br />........................................................................ <br />Subtotal (MI: 52,384 <br />TOTAL DIRBCT BBCLANATION COSTS (subtotals A through NI: 510,201 <br />------------ <br />II. INDIRHCT COST5 <br />------------------------------------------------------------------------ <br />------------------------------------------------------------------------ <br />A. CONTRACTOR'S OYBBHBAD A P80FIT <br />Item No.; Item Descriptiom ; Coet (51 <br />1. ;Public Liability [nsurmnce.... 1.550% of dir' ; 5158 <br />2. ;Contractor's Performance Bond 0.976% of dir. ; 599 <br />3. ;Contractor's Profit........... 10.00% of dir. 51,020 <br />4. Job Superintemdamt (total from xorksheetl ; <br />........................................................................ <br />Subtotal (AI: !1,279 <br />TOTAL CONSTRUCTION CONTRACT ANOUNT (direct plus 0 A PI: (11,479 <br />B. CMLRD CONTRACT ADN[NISTBATION 8%PRNSBS <br />Item Ho.; Item Description Cost (51 <br />1. Contract Preparation Fees..... 4.25% of cntr.; 5488 <br />2. DMC Admim. Bxpenses <br />........................................................................ <br />NHT INDIBBCT COST PHBCBNTAGB: 17.31% Subtotal (BI: (488 <br />TOTAL INDIBBCT BHCLANATION COSTS (subtotals A through BI: 51,766 <br />TOTAL PBRFORNANCB BOND ANOUNT (direct plus indirect costs!: 511,961 <br />
The URL can be used to link to this page
Your browser does not support the video tag.