Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />M. REVEGETATION AND RESEEDING <br />Task p~ Task Descript ron ~ Cost 151 <br />67 ~ Revegetate drill pads and roads IMR 219) ~ 510,2]0 <br />]6 ~ Mix pl - Drill Seed most areas of mine site ~ 551,899 <br />]] ~ Mix pl - Broadoast seed small areas ~ 516,775 <br />]8 ~ Nix pl - Hydroseed slopes grea ted than l:l ~ 553,250 <br />]9 ~ Mix p2 - Broadcast seed riparian areas ~ 52 E6 <br />BO ~ Shrub Mix p1 - in all areas except riparian zone ~ 519D, 999 <br />B1 ~ Shrub Mix p2 - Ripa[ian Zone ~ 53,629 <br />103 ~ Reseed Exploration road (MRp 95) ~ $1,0]5 <br />302 ~ Reseed Lone Pine Gulch pipeline corridor 1MR209) ~ 5182 <br />250 ~ Revegetate SGFA disturbance ~ 5301,569 <br />210 ~ Revegetate RPE, toad, mine entrance, and NSS a[ea ~ 5129,69] <br />Subtotal 1M1: 5758,5]5 <br />N. STRUCTURAL DEMOLITION fi REMOVAL <br />Task p~ Task Description ~ Cost (51 <br />______I____________________________________________________I____________ <br />TOTAL FROM PREVIOUS SUMtMRY SHEET ~ 55,009.441 <br />160 ~ Remove at ructu[es at Lone Pine Gulch treat ement pond 510, BBO <br />Subtotal (N1: 55,020,321 <br />0. EDUIPMENT MOBILIZATION / DEMOBIL I2ATI0N <br />Task p~ iask Description ~ Cos[ (51 <br />44 ~ Naul equipment to and from job site ~ 571.928 <br />BO ~ Maul additional equipment for PR 0] work ~ 53.159 <br />~ ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal 101: 535. OB] <br />sheet 8 of 10 <br />