Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT 6 SPECIAL HANG LING <br />Task p~ Task Desc[ipcion <br />-~ ~ _~ <br />TOTAL FROM PREVIOUS SUMMARY SHEET <br />104 ~ Rediscribuce topsoil from NSS to LRP Itle lecedl <br />104 ~ Redistribute topsoil on LRP from Mater Tank topsoil <br />i8B ~ Replace topsoil on NAter Tank [opsoil pile and road <br />165 ~ Replace topsoil at Lone Pine Gulch crea[men[ pond ~ <br />C09C 1$) <br />5450,779 <br />1$15,02]) <br />518,92] <br />52,9]0 <br />51,9'!5 <br />Subtotal (J1: 5458,189 <br />sheet 6 of 10 <br />