Laserfiche WebLink
RECLAMATION COS7 SUM9ARY con['d <br />TOTAL DIRECT RECLAMATION COSTS (su b[o[als A through P1: $8,515,917 <br />II. INDIRECT COSTS <br />A. CONTPACTOR'S OVERHEAD fi PROFIT <br />Item p~ <br />______ Item Description <br />___________________________________ <br />_______ <br />___ ~ <br />_______ <br />_ Cost I51 <br />__________ <br />I <br />1. ~ Publrc Liability Insurance..... 1. 5501 of ~ <br />direc[~ 5171.99'1 <br />2. ~ Contra cto is Performance Bond.. 0. 975Y of directs $B1, 070 <br />1. ~ Contractor's Pcofic. .. ......... 10.00f of directs 5851,592 <br />4. ~ Job Supe tint endenc.. ~ 519],699 <br />Subtotal TAI: 51,260,26'1 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT IditecC plus 0 fi P): 59,776,189 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item p~ <br />______ Item Description <br />____________________________________ ~ <br />________________ Cos[ (51 <br />____.-_---_ <br />1. ~ Project engineering Eees a[.. .. I <br />9.25t of cnt r. ~ 5415,488 <br />2. ~ Sta Ef admin. expense 1.001 of cnt r. ~ 597.762 <br /> Subtotal (B1: 5517,250 <br />TOTAL IND IRECI RECLAMATION COSTS Isubtota is A through B1: 51,773.517 <br />NET INDIRECT' COST PERCENTAGE: 20.831 <br />TOTAL PERFORIMNCB BOND AMOUNT (DIRECT plus INDIRECT costal: 510.289,474 <br />III. BOND STATUS -- BOND RE[.EA.SE SUMMARY <br />sheet 10 of l0 <br />