My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95181
DRMS
>
Back File Migration
>
Revision
>
REV95181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:18 AM
Creation date
11/21/2007 11:47:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984014
IBM Index Class Name
Revision
Doc Date
1/21/1997
Doc Name
JD-8 MINE FN M-84-014
From
COTTER CORP
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Division of Minerals & Geology <br />Permit No. M-84-014, JD-8 Mine <br />January 15, 1997 -Page 3 <br />Mining Plan <br />The Mine will be operated as an intermittent operation un <br />as mine operations are terminated. Activities similar t~ <br />have occurred since the acquisition will continue to take <br />full production resumes. As the market for uranium an< <br />dictates, the Mine may operate continuously at full or par <br />under the permitted mining plan as proposed in this techn <br />request for unknown lengths of time, or it may be mai <br />"ready" state for periods in excess of 180 days. Likewise, <br />operate at some degree between these two extremes. <br />intermittent operation, the Mine and its facilities will <br />managed in preparation for operation. Nineteen ninety-: <br />could potentially include drift development in March <br />production in July. <br />it such time <br />those which <br />place until <br />'or vanadium <br />ial capacity <br />cal revision <br />tained in a <br />the Mine may <br />s an active <br />be continuously <br />ev n activities <br />to prepare for <br />Known economic reserves remaining in the Mine are approxim <br />tons based on current economic design parameters. In add <br />tons of reserves are expected to be encountered. Product <br />reserves will be dependent on the market and the timir <br />factors associated with utilizing the Mine as an intermitte <br />The anticipated mine production life is; however, expecte <br />years (i.e., six years production from current reserves p <br />production from expected additional reserves). <br />Conclusion <br />Since February, 1987, Cotter has operated the JD-8 <br />intermittent operation. The activities which ensued <br />constituted mining operations under the current defini <br />Mineral Rules and Regulations. As such, the tempora~ <br />designation for the Mine should be withdrawn. Alternati <br />proposes to continue its operation of the JD-8 Mine as an <br />operation until mining is terminated, at which time tl <br />reclamation plan will be implemented. Accordingly, a techni <br />to permit M-84-014 is requested to allow for intern <br />operations with periods of inactivity in excess of 180 day <br />If there are any questions regarding this information, <br />(970) 864-7347. <br />Sincerely, <br />COTTER CORPORATION <br />C~ ~'~~-~ <br />Glen Williams, Manager <br />Western Slope Operations <br />tely 245,000 <br />tion, 61,200 <br />ion from the <br />of unknown <br />t operation. <br />to be eight <br />us two years <br />ine as an <br />since then <br />ion in the <br />cessation <br />ely, Cotter <br />ntermittent <br />permitted <br />al revision <br />ttent mine <br />call me at <br />DD/tlt <br />jd8~cea2.dd <br />
The URL can be used to link to this page
Your browser does not support the video tag.