Laserfiche WebLink
~ ~ •5. • <br />STATE OF COLORADO <br />Roy Romer, Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WILDLIFE <br />AN EOUAL OPPORTUNITY EMPLOYER <br />Perry D. Olson, Director <br />6060 Broadway <br />Denver, Colorado 60216 <br />Telephone: (303)297-1192 July 1, 1993 <br />• <br />RECEIVEC <br />Ms. Maxine Stewart JUL 0 91993 <br />Chairwoman <br />Mined Land Reclamation Board Division ei itit:;l~rs s a vecloyy <br />1313 Sherman St., Room 215 <br />Denver, CO 60203 <br />RE: Request for Reconsideration of Boazd Decision (File C-81-071) <br />Deaz Ms. Stewart: <br />REFER TO <br />For Wildlije- <br />For People <br />The Colorado Division of Wildlife (Wildlife) respectfully requests that the Mined Land <br />Reclamation Boazd reconsider its May, 1993 decision regarding the Eckman Pazk Mine. At the <br />May meeting, the Board was asked by the permittee, Colorado Yampa Coal Company (CYCC), <br />to reverse a Division of Minerals and Geology permitting decision. The CYCC Permit Revision <br />requested. that the post .mining land-use be changed to pastureland, and that shrubs be eliminated <br />from the reclamation requirements for the'Eckinan.Park:dviine. Minerals and Geology denied <br />the Revision because the permittee had not demonstrated to the satisfaction of that agency that . <br />wildlife impacts would be mitigated by the proposal to eliminate shrubs from the reclamation <br />plan. <br />Minerals and Geology, acting in accordance with the Boazds regulations, consulted with <br />the Division of Wildlife and the United States Fish and Wildlife Service (USFWS). Wildlife and <br />U.S. Fish and Wildlife reviewed the technical information supplied by the petmittee. Both <br />agencies determined that wildlife mitigation, as required by the Coal Mining Regulations, was <br />not adequately addressed. Therefore; both agencies, acting as consultants to Minetals and <br />Geology, recommended that Minerals and Geology deny the Permit Revision in accordance with <br />Rule 4.16.3. <br />The Division of Wildlife requests that the Mined land Reclamation Boazd reconsider its <br />previous decision for both technical and procedural reasons. Wildlife requests that the <br />reconsideration bebased upon the record and evidence presented to the Boazd at the May <br />hearing. <br />Wildlife requests tbat,ihe following specific;techni~al and procedural ~isspes be addressed <br />by the Board when reconsidering ttie~Permit Revision: <br />DEPARTMENT OF NATURAL RESOURCES, Kenneth L- Salazar, Executive Director <br />WILDLIFE COMMISSION, Thomas M. Eve, Chairman • Louis F. Swift, Vice-Chairman • Arnold Salazar, Secretary <br />Jesse Langston Boyd, Jr., Member • Eldon W. Cooper, Member • Rebecca L. Frank, Member <br />William R. Hogberg, Member • Mark Le Valley, Member <br />