My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV95072
DRMS
>
Back File Migration
>
Revision
>
REV95072
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:14 AM
Creation date
11/21/2007 11:45:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Revision
Doc Date
2/10/2006
Doc Name
Midterm Review Findings Document
From
DMG
To
MINREC, Inc
Type & Sequence
MT5
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review <br />North Thompson Creek Mines <br />C-1981-025 <br />Introduction <br />This document presents the results of the Division of Minerals and Geology's Midterm Review <br />for the North Thompson Creek Mines permit. This Midterm Review was conducted to fulfill the <br />requirements of Rules 2.08.3, 2.06.2(10), 2.06.3(4), 2.06.5(2), 2.06.7(5) and 3.02.2(4). <br />Rule 2.08.3 requires that the Division of Minerals and Geology (Division) conduct a review of <br />each permit issued, prior to its midterm. Based on this review, for good cause shown, the <br />Division may require reasonable revisions or modifications of the permit provisions to ensure <br />compliance with the Act and Regulation (Rule). <br />Rules 2.06.2, 2.06.3, 2.06.5 and 2.06.7 require that experimental practices, mountaintop removal <br />variances, variances from approximate original contour {AOC) and variances from <br />contemporaneous reclamation, respectively, be reviewed by the Division where applicable <br />during the Midterm Review. <br />Rule 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br />acceptance of the bond every 2'/z years. <br />This Midterm Review consists of a review of the most recent North Thompson Creek Mines <br />permit renewal application and Findings Document to identify items that may have been <br />overlooked during that permitting action. The Division also reviewed all subsequent revisions <br />and stipulation responses to ensure that all permit commitments and conditions were being <br />followed. Problems and observations from past inspection reports were also considered. <br />Section I -History <br />On August 15, 1983, the Snowmass Coal Company was issued a permanent program Mining <br />Permit -Coal, Permit No. C-025-81, for the North Thompson Creek Mines. Features and <br />elements of the existing mine that were to be used during subsequent operations and reclamation <br />were incorporated into the permit. The Permit was subsequently renumbered to Permit No. C-81- <br />025. This permit was for afive-year term. The Division renewed this permit for a subsequent <br />five-year term on August 16, 1988. The 1988 permit was transferred to MINREC, Inc. <br />(permiee), in 1990. The Division again renewed the permit for five-year terms on August 15, <br />1993, August 15, 1998 and August 15, 2003. This most recent five-year-term Permit, hereafter <br />referred to as the permit, expires on August 15, 2008. The suspense date for this Midterm <br />Review is February 11,2006. <br />
The URL can be used to link to this page
Your browser does not support the video tag.