Laserfiche WebLink
Bridal Veil Construction will begin mining out bench 3 as approved. The final elevation <br />for Bench 3 will be that shown in the original plan. No changes to Bench 3 are proposed. <br />No other changes to the reclamation plan are required at this time. <br />As always, please feel free to call if you have any questions. <br />Sincerely, <br />Forsgren Associates, Inc. <br />Scott Steffen <br />Civil Engineer <br />xc: Brian K. Briggs, P.E. <br />Division Manager <br />enclosure <br /> <br />