Laserfiche WebLink
topsoil stockpile locations aze proposed; approximately 8 acres aze upon existing overburden <br />storage azeas and do not represent new disturbance and 5.1 acres aze in azeas previously <br />identified as ancillary disturbance. <br />Reclamation costs for new topsoil stockpile disturbance were estimated by Mike Ellis, <br />Consulting Mining Engineer, to be $2283 per acre (including the 22.5% state contingency) as <br />noted in TR-46. Based upon 5.1 acres of new topsoil disturbance, CC&V proposed to increase <br />the Amendment 8 reclamation warranty by $11,643.00. This amount can be subtracted from <br />CC&V's current voluntary surplus warranty of $ 28,601, leaving $ 16,958 remaining in the <br />voluntary surplus financial warranty for CC&V's use as needed. With the approval of this <br />technical revision (TR-47), CC&V's total financial warranty for the Cresson Project will be <br />$ 44,636,913 (see Berhan Keffelew letter dated February 21, 2006). <br />A check in the amount of $875.00 for this technical revision request is attached. <br />Please contact me at (719)-689-4056 should you have questions or wish to discuss this request <br />for technical revisien. <br />Resources <br />xc: Paul Clazkson <br />Director, Teller County Planning Department <br />Enclosed appendices <br />