Laserfiche WebLink
3 <br />• <br />• <br />)Nor for OP Entry) <br /> Permitted Actual Proposed <br />8. Mineral ownership: <br />Indicate currently permitted acrea a for each <br />Federal:3216.2tcres 3216.2 3216.2 3216.2 <br />State: 55.7 acres 55.7 55.7 55.7 <br />Private:821.1 acres <br />Indian: 0.0 acres 0.0 0.0 0.0 <br />9. Surface ownership: <br /> <br />Indicate current) ermitted acrea a for each <br />'id`iS <br />Federal: 70.2 acres 70.2 70.2 70.2 <br />State: 55.7 acres 55.7 55.7 55.7 <br />Private:3 67 gcres <br />Indian: 0.0 acres 0.0 0.0 0.0 <br /> <br />10. Affected area (in acres) r/~i 3 <br />15 8 0 <br />11. Disturbed area (in acres) 1558.0 846.2 1558.0 <br />12. Acreage of area reclaimed in previous permit <br />term *As of <br />O1 /O1 /2000 <br />A. Backfilled and raded N!A 326.1 N/A <br />B. Retopsoiled N/A 327.7 N/A <br />C. Reseeded N/A 337.7 N/A <br />13. Acrea a for which bond has been released <br />A. 60 ercent N/A 0 N/A <br />B. 85 ercent N/A 0 NIA <br />C. 100 ercent N/A 0 N/A <br />14. Renewal Term Re nested (Years) N/A N/A 5 years <br />Note: if the app/ication contains proposed )new/ acreage, then a permit revision app/ication <br />form must also be completed for those acreages. <br />15. Type of Mine (Check one): _ Underground x Surface <br />_ Combined Surface and Underground <br />_ Loadout _ Other <br />• 16. Current Permit Status (Check one): X Active _ Temporary Cessation <br />Permanent Cessation (Reclamation Only) Suspended <br />1 7. Current Estimated Life of Mine (in years): ~ ~ <br />