Laserfiche WebLink
- ~ • i <br />Ahuda Scott -2- Febrpary 14, 1995 <br />sample collection, transportation and Lab analysis pursuant to the approved TR-06. Jn <br />addition, on December 6, 1994 the Division collected water sample splits from )kS-5, M-9, <br />and from the underdrain/collection pond discharge pipe to have an EPA certified lab conduct <br />independent analyses of these sample splits (at great expense to the Division). ~he sample <br />splits were delivemd to Accu-Labs Research, Inc., in Golden, Colorado on December 7, <br />1994. Lab results were received by the Division on December 29, 1994. Bb's lab <br />results were sent to the Division on January 25, 1995. I have enclosed a copy a~' the <br />Division's lab results for your rewrds. As noted, the test results are virtually tl~e same, or <br />very close, for the various elements that were tested for. It is comforting that the results are <br />comparatively close. <br />Since BMRI was notified, QA/QC protocol, in general, has been complied with.. BMRI <br />should strive to remain in compliance with TR-06. <br />If you have any questions give me a call. <br />Sincerely, /{~ /~ n <br />~~~l~~ ~U(~CX~C.~-Q, <br />James Dilhe <br />Environmental Protection Specialist <br />Enclosures <br />cc: Royer Flynn <br />Nora Jacquez, Ph D <br />Maclovio Martinez <br />M:\OSS\wm\ScalLjd <br />