My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94915
DRMS
>
Back File Migration
>
Revision
>
REV94915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:09 AM
Creation date
11/21/2007 11:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
9/4/2002
Doc Name
Proposed Decision Letter & Form
From
DMG
To
Snowcap Coal Company Inc
Type & Sequence
TR39
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />September 4, 2002 <br />Tonya Hammond <br />Snowcap Coal Company, Inc. <br />P.O. Box 1430 <br />Palisade, CO 81526 <br />Re: Roadside Portals (Permit No. C-1981-041) <br />Proposed Decision -Technical Revision No. 39 (TR-39) <br />South Portal Interim Drainage Control <br />Dear Ms. Hammond: <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bill Owens <br />Crovernor <br />Greg E. Walther <br />Executive Direttor <br />Ronald W. Catlany <br />Acing Division Direttor <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 39 at the Roadside Portals. Notice of the proposed decision will be published in the The Daily <br />Sentinel as soon as possible. The first publication will initiate the ten (10) day public comment period for <br />the Division's decision. <br />Documentation must be submitted to the Division demonshating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. The revision will not be final until the bond is approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />,~4 <br />~/ <br />Dan T. Mathews <br />Environmental Protection Specialist <br />DTM/Jrc <br />Enclosure <br />cc: Cazl Johnston, Office of Surface Mining, with enclosures <br />C-iR-06 C1981041 DTM 20020904 110417 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.