Laserfiche WebLink
PART L <br />Page 7 of l9 <br />• <br />E. SPECIAL REQUIRENENTS (CONTINUED) <br />1. Materials Containment Plan (Continued) <br />e. An implementation schedule for additional facilities which might be <br />required !n (c) above, but wliir.l: are not yet operational; <br />f. A list of available outside contractors, agencies, or other bodies <br />which could be utilized in the event of a spill in order to clean <br />up !ts effects. If the facility is capable of handling spills <br />in-house, Chis shall be documented in the plan; <br />g. Provision for yearly review and updating of the contingency plan, <br />plus resubmission of the plan [o the Division if conditions and/or <br />procedures at the facility change the original plan. <br />The foregoing provisions shall in no way render inapplicable tho:;e <br />requirements imposed by Section 311 of the Water Pollution Control Act <br />Amendments of 1972, regulations promulgated [hereunder, the Colorado <br />Water Quality Control Act, and regulations promulgated thereunder. <br />This plan should be prepared by a professional engineer registered in <br />• the State of Colorado. <br />Nothing herein contained shall be construed as allowing any discharge <br />to waters of the State other than through the discharge points <br />specifically authorized in this permit. Nothing herein contained shall <br />be construed as excusing any liability the permittee might have, civil <br />or criminal, for any spill. <br />The submittal of an Spill Prevention Control and Countermeasure Plan <br />(SPCC Plan) as tequired.by 40 CFR Part 112 may satisfy all or part of <br />this requirement. Should additional materials exist on site whir_h arc <br />not addressed in the SPCC Plan, addressing those materials as per the <br />above will be required. <br /> <br />Code: i - 21 Dale: 1 - 84 <br />