topsoil stockpile. If a height of 3 ft does not provide enough storage the triangular section will be <br />heightened to provide additional storage. All topsoil stockpiles will be seeded immediately after <br />placement. <br />South Pit Tonsoil Stockpile <br />The topsoil from the South Pit Area 1 will be stored in two stockpiles. The stockpile will be divided <br />in two by an small existing access road. This access may or may not be left in place. The Berm # 1 <br />will provide storage for approximately 1,000 CY. The remaining 1,614 CY of topsoil will be stored <br />in Berm #2. These berms will be sloped at 2H:1 V or less. Again the height will vary depending on <br />actual topsoil volumes in-bank. All topsoil stockpiles will be seeded immediately after placement. <br />Overburden <br />Some azeas of the site aze expected to have little to no overburden while others may have up 20' of <br />overburden. Overburden will be stripped and directly placed into its final location or stockpiled. <br />Overburden will be used to reclaim the bench azea of the pit. After excavation has taken place the <br />bench will be brought back to the approximate bench elevation of (6620'-6630'). If extra overburden <br />exists, it will be used to raise the entire bench elevafion or flatten the slopes along the western edge <br />of the bench. If insufficient overburden exist, the fill will be provided by naturals or fines produced <br />by the operation. The elevation is based on the current elevation of the mined areas shown in the <br />Spring of 2003 survey. <br />Naturals/Fines Usaee <br />During Crushing/Screenvng operations reject natural fines are produced. The fines from the Cugnini <br />Pit will have three different uses: topsoil blending, slope backfilling, and valley fill. Slope backfilling <br />will only occur once topsoil blending and valley fill requirements are met. The extra fines will be used <br />during fmal grading to lessen the slope of the South Pit Areas. Two existing fines piles will also be <br />included into this total. A table of the fines from each area and the intended usage can be seen below. <br />Volumes with a negative indicate a use of topsoil on site_ <br />North Pit Natural Fines Production and Usa e <br />ea Total Raw Tons Waste Tons@36% reject Waste cy(lcy =1S t <br />xisting Pile 5,3 <br />1 328,919 118,386 78,92 <br />327,307 117,805 78,53 <br />orth Pit Fill -36,62 <br />alley Fill #1 -120,83 <br />opsoil Blending _ -5,3 <br />otal <br />Cugaini 12!03 11 <br />