Laserfiche WebLink
F~chibit L <br />Reclamation Costs <br />The existing RILC 110 permit has a bond of approximately $70,000, <br />which is far in excess of what it will cost to reclaim that site. his antiapated that the <br />RILC bond will be released (because this operation covers all that land} and that <br />Everist Materials will provide the finanaal warranty for the future operatan when the <br />bond for this site has been firmly established. <br />The following is our estimate of the costs to reclaim the entire site: <br />Reclamation Cost Estimate <br />Task <br />Grade/Blend with surrounding <br />Reduce Slopes of Working Faces <br />Leave culverts for access <br />Structure Dismantle/Clean up <br />Reclamation Cost <br />_Total <br />$500 <br />$500 <br />$0 <br />$10.000 <br />$1 1 ,000 <br />Contract Administration (18.5%) $2.035 <br />Reclamation Cosi w/ Admin $13,035 <br />Office Administration (5%) ____ 6_2 <br />Total Reclamation Bond $13 687 <br />16 <br />