5.0 Describe Exploration Activities <br />Ic is anticipated the drilling program will be conducted during the summer and fall of 1999 while <br />weather conditions for field activities are most favorable. Routt County Roads 29 wlll provide <br />primary access to the projea area with secondary access routes used as indicated on the enclosed <br />three maps (NOI99-1, NOI99-2, NOI99-3). Exploration activities aze estimated to require less than <br />two weeks of drilling per hole for all sites. The exploration program will be modified and tailored as <br />necessary depending upon results of the initial drilling, rig availability, and weather conditions. The <br />proposed plan provides for rrlar;r*lum flexibility in the drilling program by seeking approval for all <br />potentially drilled locations. <br />Road Construction: Existing roads and trails will be used whenever possible ro m;n;m;~r the amount <br />of road construction undertaken within the drilling area. Significant alterations of existing roads aze <br />not anticipated. TCC does not intend to develop access roads beyond general leveling and smoothing <br />of the ground to facilitate access by drilling equipment. Surface disturbance will be kept to a <br />minimum with access to proposed sites limited to dry periods to the extent possible. New roads will <br />be constructed only as necessary in order to protect and preserve the existing topsoil resources and <br />minimize erosion. In the event additional roadwork is required to maintain adequate access to drilling <br />sites, the available topsoil (typically 24" deep) will be windrowed to the side of the road in a stable <br />configuration and stockpiled for use during final reclamation of the road. Mobile equipment, typically <br />a small bulldozer, will be utilized for routine road maintenance and any necessary consuTrction <br />activities. Some minor road consuuction may be necessary if weather conditions dictate. Access to <br />all sites is provided by existing roads, which may inquire routine maintenance or minor rehabilitation <br />activities but which are not anticipated to require significant alteration. Table 3 details potential <br />disturbance areas and topsoil volumes associated with the additional road construction potentially <br />associated with this projea. <br />Drill Site Construction: Topsoil will be removed as necessary and stockpiled to avoid contamination <br />adjacent to each drill site developed. Given the anticipated short duration between topsoil salvage <br />and replacement at each site, no interim seeding is anticipated. Constucted drill pads for all sites will <br />be approximately 100 fr x 100 fr in size with associated total disturbance areas of approximately 0.3 <br />acres. After topsoil has been removed, the pad areas will be leveled with a small dozer to <br />accommodate the drill rig and associated equipment. The proposed exploration sites are typically <br />located on gently sloping areas, with slopes ranging from Flat to approximately 10 % and averaging <br />approximately 7 %; the associated leveling work required at each site wlll be minimal. Mud pits will <br />be excavated within the pad areas following topsoil salvage and leveling work Material excavated <br />from the mud pits will be segregated from the topsoil and retained within the boundary of the drill <br />pad Sediment control will be achieved by retaining runoff within the drill pad azea to the extent <br />possible. In the event persistent runoff occurs from the disturbed area, silt fences or other temporary <br />sediment control measures may be employed to reduce off-site sediment transport. Because none of <br />the proposed sites are located close to Middle or Fish Creeks, the potential for wazer quality impacts <br />associated with this projea aze negligible. <br />,.TABLES " <br />TOPSOIL VOLUMES ASSDCIATED WITH PAD AND RDAD CONSTRGCTION"- <br />Pro ect Data Volumes (cubic leetl <br />5 pads Dimensions: 100,000 <br /> 100 ft x 100 ft <br /> Topsoil depth: <br /> 2 ft <br /> Calculation: <br /> Sx 100x 100x2= 100.000 <br />1 road Length: Road Width: 320,000 <br /> -8.000 It 20 ft <br /> Topsoil depth: <br /> 2 h. <br /> Calculation: <br /> 8.000 x 2 z 20= 320.000 <br />MONTGOMERY WATSON August 7999 <br />