My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94707
DRMS
>
Back File Migration
>
Revision
>
REV94707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:02 AM
Creation date
11/21/2007 11:42:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980047
IBM Index Class Name
Revision
Doc Date
11/30/1982
Doc Name
GEOTECHNICAL REVIEW OF EXXONS SUPPLEMENTAL SUBMITTALS TO THEIR INTERIM SITE PLAN
From
MLR
To
JIM MCARDLE
Type & Sequence
AM4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STATE OF COLORADO aiCHngn U. ~AMM, rP rv~.•.v ~• <br />III IIIIIIIIIIIIIIII <br />999 <br />DEPARTMENT OF NATURAL RESOURCES <br />D. Monte Pascoe, Executive Director <br />MINED LAND RECLAMATION <br />423 Centennial Building,1313Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />November 30, 1982 Director <br />T0: Jim McArdle 11~-`^/-~Q~' <br />FROM: Jim Pendleton <br />RE: Geotechnica~l' Revi of Exxon's Supplemental Submittals to Their <br />"Interim Site an" <br />Pursuant to your request, I have reviewed the supplemental amendments and <br />additional information submitted by Exxon in response to our October Adequacy <br />Review of their interim site plan for the Colony Project. I forward the following <br />comments regarding remaining inadequacies of the geotechnical and hydrological <br />aspects of their amended interim plan, for your consideration. <br />In general, the supplemental submittals made by the operator have been helpful <br />in resolving deficiencies contained in the original interim plan. However, <br />several inadequacies remain to be resolved. My following comments are arranged <br />in the order of occurrence within the amended interim plan permit document and <br />within my earlier memorandum of October 8, 1982. <br />Exhibits D and E <br />The amended text, additional maps and amended Table D-1 clarify the subareas being <br />delineated for various forms of interim treatment. <br />Area 3c: "Abandoned South Access to 4lest Fork" <br />In response to our earlier adequacy comments, the operator has committed to <br />removal of the 4lest Fork of Parachute Creek culvert, if the landowner, Union Oil <br />Company, consents. <br />Area 5a: "TOSCO Flats" <br />The operator observes within the interim plan application: <br />" .The final surface configuration of the Semi-llorks area, at least in <br />this interim period, depends on timing of the removal of the existing Semi- <br />Works and the results of an engineering study that addresses alternatives <br />for resloping the spoil pile at the base of Davis Gulch. The source of <br />material for regrading will be the excess fill currently existing in Area <br />19b. There will be extensive water channel work associated with the site, <br />but the details have not yet been developed." <br />
The URL can be used to link to this page
Your browser does not support the video tag.