Laserfiche WebLink
TABLE 4 <br />GALLEGOS CORPORATION <br />CONGER HARVESTING AREA <br />MINE BENCH ROAD <br />ESTIMATED RECLAMATION REQUIREMENTS <br />Date: 03/25/01 <br />Reserve estimate assumes that the area for each cross section <br />is representative of the area to a point that is halfway to the adjacent <br />cross section <br />Assumptions: <br />1. In place density of boulders is: 2970 <br />2. Conversion factor to tons is: 1.485 <br />3. Assumed annual tonnage = 750 <br />Ibs/cu. yd. Density of Broken Sandstone <br /> Area, sq. ft. Interval Volume, cu. yd. <br />Section Cut Fill Feet Cut Fill <br />3+00 E 0 0 50 0 0 <br />2+00 E 0 0 100 0 0 <br />1+00 E 0 0 100 0 0 <br />0+50 E 233 55 50 216 51 <br />Staging 297 163 99.77 824 452 <br />1+00 W 123 181 99.53 453 667 <br />2+00 W 238 133 97.87 863 482 <br />3+00 W 296 162 99.29 1,088 596 <br />4+00 W 0 0 100 0 0 <br />5+00 W 0 124 100 0 459 <br />6+00 W 0 99 100 0 367 <br />7+00 W 0 0 50 0 0 <br />Total 1 187 917 3444 3 074 <br />Estimated cu. yd. required for reclamation 6,518 <br />Length of Main Bench, ft. 663.36 <br />Length of Mine Bench Road, ft. 696.69 <br />Cu. Yds. per ft. of Highwall 4.7924345 <br />Cu. Yd. for 1.5 years 1,662.20 <br />