My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94671
DRMS
>
Back File Migration
>
Revision
>
REV94671
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:20:01 AM
Creation date
11/21/2007 11:42:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977227
IBM Index Class Name
Revision
Doc Date
8/10/2001
Doc Name
COST SUMMARY FORM
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 08/10/2001 <br />User: JD1 <br />State :Colorado <br />County : Costilla <br />Site :Mesita Hill Pit <br />Agency or organization name : DMG <br />PermiT or other job action :Final Reclamation <br />Task description : PUSh floes into <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D7R - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : NA <br />Cost Breakdown <br />MATERIAL QUANTITIES <br /> Utilization <br />Ownershipcost/hour : $37.39 NA <br />OperatingcosVhour : $49.44 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $27.99 NA <br />Total unit cosf/hour : $114.82 Total fleet cosUhour <br />S11d_R9 <br />Initial Swell Loose <br />volume: 164,900 LCY factor : NA volume: 164,900 LCY <br />Source of estimated volume :Operator <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : i.20 (Cat HB) <br />Unadjusted hourly production : 1,022.9 LCY/hr Dozing method : 1.20 (slot) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiWday} <br />Loose stockpile Spoil pile : 1.00 (doz-oc) <br /> Push gradient : 1.01 (Cat HB) <br />Average push gradient : 0.50 °5 (neg) Altitude : 0.88 (Cat HB) <br />Average site altitude : 7, 750 feet Material weight : 1.15 (user) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,000 Ibs/LCY Nei correction : 0.92 <br />Weight description <br />USER-PROVIDED WEIGHT DATA Adjusted unit production : 937.68 LCY/hr <br /> Adjusted fleet production : 937.68 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 175.86 Hours <br />Unit cost : $0.122 /LCY Total job cost : $20,192 <br />PermiVjob# : M-1977-227 <br />Abbreviation :none <br />Filename :M227-002 <br />Horsepower: 230 <br />Shift basis : i per day <br />Data source : (CRG) <br />
The URL can be used to link to this page
Your browser does not support the video tag.