Laserfiche WebLink
To: Joe Dudash ,~.~ <br />Fm: Harry Ranney Q~~1- <br />Re: Bond Calculation <br />I have reviewed the bond estimate for Golden Eagle's Minor Revision <br />51 (powerline pole removal). The estimate of $1792 adequately <br />covers the costs of removing the poles and reclaiming the disturbed <br />areas. <br />