My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94546
DRMS
>
Back File Migration
>
Revision
>
REV94546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:56 AM
Creation date
11/21/2007 11:41:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/25/2006
Doc Name
Adequacy Review & Cost Estimate Attached
From
DMG
To
Bowie Resources, LLC
Type & Sequence
MR65
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinstl Software <br />rnv~c-v~ wu. <br />Task # : 224 State :Colorado PermiVjob# : C-1998-083 <br />Date : 04/24/1006 County :Delta Abbreviation :none , <br />User : JRS Site :Bowie No. 2 Mine Filename : C083-224 <br /> <br />Agency or organization name : Colorado Division Of Minerals And Geology <br />Permit or other job action : Minor Revision 65 <br />Task description : Replace Topsoil from Stockpile to Drill Pads ~ <br />HOURLY EQUIPMENT COST ~ <br /> Basic machine :Cat D9R - 9SU Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment na. 1 :ROPS Cab I Shift basis : 1 perday <br /> Attachment no. 2 ; 3-shank ripper <br /> Data source : (CRG) <br /> <br />Utilization i <br />Cost Breakdown : Ownership cosUhour : $56.94 NA <br /> Operating cosUhour : $104.98 100 <br /> Ripper op. cost/hour ; $0.00 0 <br /> Operator cosUhour ; $32.53 NA ' <br /> <br />Total unit cost/hour I <br />: $194.45 Total fleet cosUhour : <br />$194.45 <br /> <br /> <br />MATERIAL QUANTITIES > <br />; _ <br />Initial Swell Loose <br />volume : 1,800 BCY factor : 1.250 volume : 2,250 LCY <br /> 1 <br />Source of estimated volume :Division Estimate <br />Source of estimated swell factor :CAT Handbook <br />HOURLY PRODUCTION Job Condition Correction Factors ~ Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : , 1.00 (Cat HB) <br />Unadjusted howdy production : 1,243.2 LCY/hr Dozing method : ' 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiR/tlay) <br />Consolidated stockpile Spoil pile : 0.80 ~ (fnd-r~ <br /> Push gradient : 0.90 (Cat HB) <br />Average push gradient : 5.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 7, 300 feet Material weight : ' 0.90 (Cat HB) <br /> Blade type : ' 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : ; 0.41 <br />Weight description <br />Earfh - Drv Hacked <br />Adjusted unit production : 504.38 LCY/hr <br />Adjusted fleet production : 504.38 LCYlhr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer{s) Total job time : 4.46 Hours <br />Unit cost : $0.386 /LCY Total job cost : ~ $887 <br />_ < <br />i <br />
The URL can be used to link to this page
Your browser does not support the video tag.