Laserfiche WebLink
DSCAL 0. HYDROGRAPH PLOT SCALE <br /> IPNLH <br />IOUs D <br />21 PUNCH COMPUTED HYDROGRAPH <br />SAVE HYDROGRAPH ON THIS UNIT <br /> ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED <br /> ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED <br /> TIMINT 0.017 TIME INTERVAL IN HOURS <br />a-~-..+-..r+ .+. ++...-. +.a .a,..k. a.-. +.+ ..+ +.. ~.-. +.-...+ +-.......-..++ .+-............-..~.... +...-.. ++...+ ...... <br /> <br />205 KK * 118@S3 <br /> *~x..++. r.++- t.+ <br />206 KO OUTPUT CONTROL VARIABLES <br /> IPRNT 5 PRINT COHTROI <br /> IPLOT 0 PLOT CONTROL <br /> OSCAL 0. HYDROGRAPH PLOT SCALE <br /> IPNCH 0 PUNCH COMPUTED HYDROGRAPH <br /> IOUT 21 SAVE HYDROGRAPH ON THIS UNIT <br /> ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED <br /> ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED <br /> T IMINT 0.011 TIME INTERVAL IN HOURS <br />3 <br /> RUNOFF SUMMARY <br /> FLGW IN CUBIC FEET PER SECOND <br /> TINE 1N HOURS, AREA IN SQUARE MILES <br />• PEAK TIRE OF AVERAGE FLOH FOR MAXIMUM PERIOD BASIN NAXIMUH TIME OF <br /> OPERATION STATION FLON PEAK AREA STAGE HAX STAGE <br />+ 6-HOUR 24-HOUR 72 -HOUR <br /> HYDROGRAPH AT <br />+ 1 40, 12.18 7. 2. 1. 0.14 <br /> HYDROGRAPH AT <br />+ 2 10. 12.05 1. 0. 0. 0.02 <br /> ROUTED TO <br />+ 2@1 10. 12.08 1. 0. 0. 0.02 <br /> 2 COMBINED AT <br />+ 1~2 47. 12.15 8. 2. 2. 0.16 <br /> ROUTED TO <br />+ 1 .2@3 46. 12.17 8. 2. 2. 0.16 <br /> HYDROGRAPH AT <br />+ 3 11. 12.15 2. 1. 0. 0.02 <br /> 2 COMBINED AT <br />+ 1-3 51. 12.17 9. 3. 2. 0.19 <br /> ROUTED TO <br />+ 1 -3@4 54. 12.20 9. 3. 2. 0.19 <br /> NYDROGRAPH AT <br />+ 4 8. 12.02 1. 0. 0. 0.01 <br />• 2 COMBTHED AT <br /> 1-4 56. 12.20 10. 3. 2. 0.20 <br />