Laserfiche WebLink
`.`~ <br />FLATIRON COMPANIES <br />NORTHGATE LOADOUT <br />PHASE II-III BOND RELEASE APPLICATION <br />1. Date of request: November 2, 1995. <br />2. Permittee: Flatiron Companies dba Walden Coal Company. <br />3. Permit Number: C-81-021. <br />4. Date Permit Renewed: April 21, 1993. <br />5. Facility Name: Northgate Loadout. <br />6. Phase of Bond Release Requested: II and III. <br />7. Number of Acres: 2.82. <br />8. Bond Company: St. Paul Fire and Marine Insurance Company. <br />9. Bond Number: 400 HE 7644. <br />10. Current Total Amount of Bond: $214,400. <br />11. Dollar Amount Requested for Release: $0. <br />12. Legal Description of the Area Requested: <br />Part of S1/2 NE1/4 Sec 31 T11N R79W Jackson County, CO. <br />13. A Map Showing Area: See Exhibit A. <br />14. Date Reclamation Performed: <br />Grading and seeding was completed in October 1988. <br />15. A Description of the Results Achieved: <br />Walden Coal Company removed all coal from the loadout site. <br />The site was then graded. All topsoil stockpiled at the site was <br />spread across the disturbed area. The property was ripped and <br />seeded with the approved Northgate seed mix (Exhibit B). Although <br />vegetative cover is not required due to the industrial post-mine <br />land use and the fact that the property is level and thus does not <br />have any surface water runoff, a healthy stand of vegetation has <br />been established on the site. There is currently no pollution of <br />surface or sub-surface water occurring and the probability of <br />future pollution is virtually non-existent. <br />