Laserfiche WebLink
<br /> <br />EXHIBIT L <br />Reclamation Costs <br />There is no change proposed to the existing reclamation bond for this operation. The additional <br />lands will be mined sequentially as is the case in the existing permit. The amount of disturbed <br />acreage will not be increased. The haul routes will be lefr for the property owners use following <br />reclamation of the site. <br />