Laserfiche WebLink
<br />EXHIBIT D <br />Mining Plan <br />This amendment application proposes to add property to the currently permitted mining <br />operation. This will be a continuation of the mining that Monks Construction is presently doing <br />on the property. The new lands aze identical in topography and geology to the current permit <br />azea. <br />The additional land will increase the number of phases from eight to twelve. Mining of the <br />phases will continue as was originally stated and approved in the current permit. Total disturbed <br />azea at any one time will not increase above the currently permiried 43 acres. <br />A new site access point will be added to the permit from Colorado Highway 115. The existing <br />northern haul route will be used as the primary route until such time that all required permits aze <br />obtained to allow the use of the eastern haul route. Once the construction of the eastern haul <br />route is completed and the route is useable, the haul route to the north will be vacated per the <br />lease agreements. <br />The applicant will be placing a truck scale, shop building and an office at the east access point. <br />There may also be stockpiles of materials for retail sales and for severe weather days when the <br />mining areas aze not accessible. The applicant also anticipates placing an asphalt batch plant <br />and/or a concrete batch plant in this azea. These plants would be moved from their current <br />locations at the Airport Pit #1 (M-80-096). <br />No other changes to the mining plan will occur with this amendment. <br /> <br />