My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94112
DRMS
>
Back File Migration
>
Revision
>
REV94112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:42 AM
Creation date
11/21/2007 11:38:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991035
IBM Index Class Name
Revision
Doc Date
3/27/1995
Doc Name
RECLAMATION COST SUMMARY FORM
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Division of Minerals end Geology <br />ESTIMATING fORM - BULLD02ER NORK <br />Task N: 1 Prep, by: BK Tesk File Name: M035-1 <br />Date: 03/27/95 Permit M:M-91-035 Mine: Conde/Mckey Pit <br />Permit Action: amenment to a permit <br />Task Desc ri p[ion: rough grade <br />XOURLY EOUIPNENT COST <br />_____________________ Basic Machine: Cat D8N xorsepower: 285 <br />Blade Type: Universal ---------- <br />Attachment k1: ROPS Cab Shift Basis: 1/day <br />Attechnent }!2: 1-shank ripper ---------- <br />Cost Breakdown: <br />-------------- Utilization X (code OSO) <br />Ownership cost/hr = 545.78 N/A <br />Operating 8 overhaul cost/h r- dozer = 540.63 100 <br />-ripper (3.05 50 <br />Operator cost/hr = 521.58 N/A <br />Total egpt. unit cost/hr = (717.04 Total fleet coat/h r: 5111.04 <br />MATERIAL QUANTITIES <br />___________________ <br />___________________ <br />Initial Swell Loose <br />Volume: 70,000.0 BCY Factor: 1.250 Volume: 87,500.0 LCY <br />Source of quantity take-off: ezhi bit t <br />---------------------------------------------------- <br />Source of est. swell factor: n/a <br />XOURLT PRODUCTION <br />_________________ Job Condition Correction Factors <br />Avg. push distance: 250 ft. --------------------- ----------- <br />_ ________ Operator.......... 0.75 (avg.) <br />Unadjusted hourly Mat. consistency.. 1.10 (Ca[ tbl) <br />dozer production: 420 LCY/hr Dozing method..... 7.00 (gen.) <br />- -------- Visibility........ 1.00 (avg.) <br />Material consistency: Job efficiency.... 0.83 (1sh/day) <br />Pertly Consolidated s tockpile Transmission type. 1.00 ( PS ) <br />--------------------- -------- -------- Grade adjustment.. 0.97 (Cat tbl) <br />Avg. push gradient: 2.00 X (pos) Altitude adj. .... 1.00 (Cat tbl) <br />- -------- Materi eL weight... 1.00 (Cat tbl) <br />Avg. site altitude: 6000 ft. Blade type........ 1.00 (S or U) <br />Materiel weight 2300.00 lb/LCY Net Job Correction 0.66 <br />Ma[. Descr.: - -------- ----------~ <br />GENERAL FILL Adjusted Unit Prod.: 279.00 LCY/hr <br /> Adjusted Fleet Production: 279.00 LCY/hr <br />JOB COST ----------- <br />Fleet size 1 Dozen(s) Total Job Time: 313.62 Nouns <br />Unit Cost (0.398 /LCY Total Job Cost: f34,823.93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.