My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94079
DRMS
>
Back File Migration
>
Revision
>
REV94079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:40 AM
Creation date
11/21/2007 11:37:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
Revision
Doc Date
11/24/1998
Doc Name
MCCLANE CANYON MINE CO-80-004 RESPONSE TO ADQ LETTER TR 09
From
GRAND VALLEY COAL CO
To
DMG
Type & Sequence
TR9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiiiiii <br />GRAND VALLEY COAL COMPANY 999 <br />P.O. Box 70 <br />Loma, Colorado 81524-0070 f~`'~ <br />(970) 858-3608 FAX (970) 858-7690 1~/1 ,sl ~ f <br />November 24, 1998 <br />Mr. Dan Mathews <br />Division of Minerals & Geology <br />2148 Broadway; #C-5 <br />Grand Junction, CO 81503 <br />Re: McClave Canyon Mine, CO-80-004 <br />Response to Adq. Letter - TR-09 <br />Dear Mr. Mathews, <br />Grand Valley Coal Company submits the following responses to the concerns <br />raised in the March 9, 1998 adequacy review letter. <br />2. The Division directed the operator to provide designs for additional erosion <br />protection in some of the reclaimed channels. After discussions with the Division, <br />Grand Valley decided to utilize a turf reinforcement material to protect the <br />channels. The manufacturer of the product recommends that the shear in the <br />channel be limited to 2.0 Ib/sgft for the material to be effective over the long <br />term. Page 3 of Table 3.1-1 has been added to show the shear calculations for <br />the channels identified by the Division. <br />3. The empirical proof of the effectiveness of the sediment pond is provided as Page <br />M-10 of Appendix M. <br />5. The cross sections are provided on Page M-9 of Appendix M. <br />6. Table 3.7.1, Reclamation Costs has been revised and totally reprinted to reflect <br />the changes for channel armoring and to incorporate the changes made for MR-24 <br />and MR - 25. <br />7. The language regarding rip rap has been added to Page 2 of Table 3.1-1. <br />Please contact me or Mr. Larry Jones at White Oak Mining (435) 637 - 9200 if you <br />have questions or require additional information. <br />Sincerely; <br />ohn M. alters <br />Manager of Mine Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.