My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV94065
DRMS
>
Back File Migration
>
Revision
>
REV94065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:19:40 AM
Creation date
11/21/2007 11:37:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Revision
Doc Date
6/26/1998
Doc Name
DESERADO MINE PN C-81-018 MR-112 EAST PORTAL FACILITIES RELOCATION
From
DMG
To
BLUE MOUNTAIN ENERGY INC
Type & Sequence
MR112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />DeparimeM of Natural Resources <br />1313 Sherman SI ,Room 215 <br />Denver, Colorado 80203 <br />Phone. (3031 866-3567 <br />FA%: (3031 8 3 2-81 06 <br />June 26, 1998 <br />Mr. Scott Wanstedt <br />Blue Mountain Energy, Inc. <br />P.O. Box 1067 <br />Ral3gely, Colorado 81648 <br />RE: Deserado Mine (Permit No. C-81-018) <br />MR-112 (East Portal Facilities Relocation) <br />Dear Mr. Wanstedt: <br />~I~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />lames S Lochhead <br />Executive Director <br />Michael B. Long <br />Division Director <br />I have done a preliminary review of the referenced minor revision application. Certain additional <br />information will need to be submitted before we can determine the application to be complete. <br />Specifically, a completed DMG "APPLICATION FORM FOR A REVISION TO A COAL <br />MINING AND RECLAMATION PERMIT" will need to be provided. Also, the amended Map <br />I S will need to be certified as required by Rule 2.10.3(2). Three copies of the amended map and <br />two copies of any revised application pages should be provided. <br />No revised application pages were included with the original submittal, but it would appear that <br />permit application text will need to be amended in various sections to address proposed facility <br />changes, and to address current status of East Portal operations and anticipated time frame for <br />portal closure and final reclamation of the facility. <br />Description and dimensions of the proposed new facilities to be located in the D Portal Area <br />should be included in Section IV.B., Mine Portal Facilities. Narrative regarding waste disposal <br />in Section IV.D.I should also be updated as appropriate. Section III.C., Auxiliary Facilities, <br />would appear [o be [he most appropriate section to include updated narrative on current status of <br />the East Portal site. Also, it would appear that a sediment control plan for the regraded E Portal <br />bench area will need to be provided before final reclamation of the site is initiated. The sediment <br />control plan would not necessarily need to be included within this revision. <br />Please contact me if you have any questions. <br />Sincere) ~~~ <br />Dan T. athewsl <br />Environmental Protection Specialist <br />cc: Denver File <br />
The URL can be used to link to this page
Your browser does not support the video tag.