Laserfiche WebLink
<br />~r..~ <br /> SL-7 Table of Contents <br />Section Subject Pa e s <br /> <br /> Phase III Bond Release--Introduction 1 <br />1.0 Bond Release Parcels Management and Reclamation Histories 1 <br />2.0 Documentation of Successful Vegetation Establishment 1 <br />2.1 Vegetation Sampling Summary 2 <br />2.2 Sample Adequacy 2 <br />3.0 Achievement of the Post-Mining Land Use 2 <br />3.1 Croplands 3 <br />3.2 Rangelands 3 <br />4.0 Potential Hydrologic Impact 3 <br />4.1 Permanent Hydrologic Features 4 <br />4.2 Surface Water Impacts 4 <br />4.3 Ground Water Impacts 5 <br />4.3.1 Impacts to Adjudicated Welis 6 <br />4.4 Post Mine Hydrologic Balance 7 <br />4.5 Sediment Loss Evaluation 7 <br />5.0 Proposed Reduction in Bond Obligation 7 <br />TABLES <br />Table 2.1-1 Vegetation sampling summary and comparison against 8 <br /> bond release standards. <br />Table 2.2-1 Reverse null T-Test on mean to demonstrate revegetation 10 <br /> success for production and shrub density values. <br />Table 5-1 Calculation of bond liability to be released with SL-7 phase III 11 <br /> request. <br />