Laserfiche WebLink
I~ <br />TRAPPER MINE <br />RECLAIMED PARCEL HISTORY <br />Parcel Designation: A-B-95 <br />Reclamation Year(s) of <br />Activity Occurrence <br />Regrade ~ 1995 <br />~~ <br />Topsoil <br />1995 <br />1995 <br />Acreage: 39.2 <br />Comments <br />How Measured: Load counts <br />Topsoil Origin; Stockpile ® Livehaul <br />Dragging ~ Disking ~ Other LJ lexpiam) <br />Rate: 100 Ib/ac on replaced topsoil <br />Refer to Table(s) 95-966 <br />Bond Release Phase 1* Phase II Phase ill <br />Application # SL-1 SL-5 SL-6 SL-7 <br />Approval Date 2/12/98 6/11/04 9/6/05 <br />Comments: *SL-1 the 23.3 acre portion east of Middle A Haulroad only. SL-5 the 15.9 acre <br />portion south of Middle A Haulroad. <br />M:IRECUAHS <br /> <br />