Laserfiche WebLink
i <br />J <br />a <br />s, <br />0 <br />y <br />T <br />s <br />1 <br />w <br />n <br />:a <br />:J <br />O <br />U <br />.r, <br />a. <br />0 <br />i <br />a <br />v :� <br />W R I T T E N <br />SNAPPERS CROSSING <br />A PART OF THE SW 1/4 OF SECTION 32, TOWNSHIP 6 SOUTH, <br />RANGE 71 WEST OF THE 6TH PRINCIPAL MERIDIAN <br />COUNTY OF JEFFERSON, COLORADO <br />OFFICIAL DEVELOPMENT PLAN AMENDMENT 1 <br />RESTRICTIONS SHEET 2 OF 3 <br />OWNERS: WILLIAM AUGUST PETERSON, CAROL LYNN PETERSON, <br />AND WILLIAM SAMUEL PETERSON. <br />3. MINIMUM OPEN SPACE - 4096 POST RECLAMATION <br />LAND USE DESCRIPTION <br />rAnrN/A g,= REV: <br />IuRYE M4Im REV: <br />DRAWN BY: TRF CHW D BY: <br />DATE OF SURVEY: 11/09/05 <br />9937 W. 25TH AVENUE <br />LAKEWOOD, CO 80215 <br />303 - 202 -1560 <br />WWW. FALCONSURVEY%G. COM <br />REV: <br />REV: <br />JJM JOB NO. 20606 <br />20606ODPSHEET2.DWG <br />B. ENFORCEMENT <br />1 . INSPECTIONS: PERIODIC INSPECTIONS OF MINING OPERATIONS MADE <br />BY PERSONNEL FROM THE JEFFERSON COUNTY PLANNING (DEPARTMENT AND <br />ANY OTHER AGENCIES WITH ENFORCEMENT RESPONSIBILITIES CONCERNING REGULA- <br />TION OF ANY ASPECT OF THE MINING OPERATION SHALL BE ALLOWED BY <br />THE OPERATOR. WHEN ANY VIOLATION OF THE PROVISIONS AND TERMS <br />OF THIS OFFICIAL DEVELOPMENT PLAN IS DETERMINED TO EXIST, THE <br />COUNTY SHALL FORTHWITH NOTIFY THE MINED LAND RECLAMATION DIVISION <br />THAT THE OPERATION IS IN VIOLATION OF THIS OFFICIAL DEVELOPMENT PLAN AND <br />SHALL REQUEST THAT THE DIVISION ALSO SUSPEND THE OPERATORS STATE <br />MINING PERMIT, <br />2. ANNUAL REPORT: THE OPERATOR SHALL PREPARE AND SUBMIT TO THE <br />PLANNING AND ZONING DEPARTMENT, AN ANNUAL REPORT WHICH, AS A MINIMUM, <br />SHOULD INCLUDE THE FOLLOWING: <br />A. OPERATIONS: A REPORT IDENTIFYING DAYS OF OPERATION AND IDENTIFYING <br />ALL DAYS ON WHICH THE DETONATION OF BLASTING MATERIAL WITHIN 250 <br />FEET OF THE GROUND SURFACE HAS OCCURRED. <br />B. RECLAMATION: A PROGRESS REPORT ON RECLAMATION IDENTIFYING AREAS <br />BEING RECLAIMED, AREAS IN WHICH RECLAMATION IS COMPLETE, AND THE <br />SUCCESS AND FAILURE OF ALL RECLAMATION EFFORTS TO DATE. <br />C. AIR QUALITY DATA: A REPORT ON ANY VIOLATION OF AIR QUALITY <br />STANDARDS AS DETERMINED BY THE RESPONSIBLE STATE OF COLORADO OR <br />FEDERAL AGENCIES AND THE MANNER IN WHICH SUCH VIOLATIONS WERE <br />RESOLVED. <br />D. PRODUCTION AND TRANSPORTATION: A REPORT ON TRANSPORTATION ACTIVITIES <br />WHICH IS A SUMMARY OF HOW MATERIAL WAS ACTUALLY TRANSPORTED OFF - <br />SITE INCLUDING TRUCK OR OTHER TRIPS AS APPROPRIATE. <br />E. HYDROLOGIC DATA: A REPORT OF HYDROLOGIC DATA WHICH IDENTIFIES <br />ANY IMPACT OF THE OPERATION ON THE HYDROLOGIC CYCLE INCLUDING <br />EROSION AND SEDIMENTATION, SETTLING PONDS, AND ANY STRUCTURES <br />DESIGNED TO ADDRESS THE 100 YEAR FLOOD. <br />F. ANNUAL REPORT: A REPORT ON ANY VIOLATIONS OF ANY APPLICABLE <br />FEDERAL, STATE OR COUNTY STANDARD OR REGULATION CONCERNING <br />AIR, NOISE, OR WATER QUALITY AND THE MANNER IN WHICH SUCH VIOLATIONS <br />WERE RESOLVED SHALL BE SUBMITTED TO THE JEFFERSON COUNTY PLANNING <br />AND ZONING DEPARTMENT IN JULY OF EACH YEAR. <br />III. GENERAL REQUIREMENTS <br />4. <br />DELETED <br />INTENT: TO AMEND THE EXISTING ZONING TO ALLOW FOR EXTENSION <br />5. <br />LIGHTING: REFER TO JEFFERSON COUNTY <br />OF MINING UNTIL DECEMBER 31, 2020; 2)TO ALLOW FOR <br />FUMES BEYOND <br />ZONING (RESOLUTION. <br />CEMENTACIOUS MATERIAL BATCHING FACILITY AND; 3) USE AND <br />6. <br />SIGNAGE: REFER TO JEFFERSON COUNTY <br />OPERATION OF CRUSHING /PROCESSING EQUIPMENT. <br />7. <br />ZONING (RESOLUTION. <br />ARCHITECTURE: REFER TO JEFFERSON COUNTY/ <br />GENERAL PROVISIONS <br />OR FORCES. <br />ZONING RESOLUTION. <br />3. NO MINING ACTIVITY OR TOPOGRAPHICAL <br />8. <br />FENCING: REFER TO JEFFERSON COUNTY <br />EXCEPT AS EXPRESSLY PROVIDED IN THIS OFFICIAL DEVELOPMENT <br />THE PLANNING AND ZONING DIVISION. <br />ZONING RESOLUTION. <br />PLAN, DEVELOPMENT OF THIS PROPERTY SHALL CONFORM TO THE <br />9. <br />LANDSCAPING: (TO BE CONTINUED THROUGHOUT <br />JEFFERSON COUNTY ZONING RESOLUTION, LAND DEVELOPMENT <br />RECLAMATION PHASE) <br />REGULATIONS, BUILDING CODE, AND ENGINEERING SPECIFICATIONS. <br />A. <br />REFER TO JEFFERSON COUNTY <br />ALL OTHER APPLICABLE COUNTY REQUIREMENTS, ARE IN EFFECT <br />ZONING RESOLUTION <br />AT THE TIME OF PLATTING OR BUILDING PERMIT APPLICATION. <br />B. <br />A LANDSCAPE BUFFER <br />AROUND THE ODP BOUNDARY SHALL <br />I. LAND USE <br />BE ESTABLISHED AND CONTAIN THE <br />FOLLOWING: <br />A. PERMITTED USES: (POST RECLAMATION) <br />I. <br />ONE TREE (EVERGREEN OF MIN. 6 FT.) <br />DECIDUOUS OR ORNAMENTAL MINIMUM <br />I BUSINESS AND PROFESSIONAL OFFICES (EXCEPT <br />2' CALIPER EVERY 25 FEET. <br />MEDICAL OFFICES) <br />B. <br />ONE TREE AND SIX (6) SHRUBS PER 25 LINEAL <br />2 AMBULANCE SERVICE <br />FEET DURING RECLAMATION. <br />3. SPECIAL TRADES CONTRACTING SERVICES SUCH AS <br />10. <br />MINERAL EXTRACTION CONDITIONS <br />A. PLUMBING, HEATING, REFRIGERATION AND AIR <br />A. <br />OPERATIONAL STANDARDS <br />CONDITIONING <br />ALL MINING OPERATIONS SHALL MEET THE <br />B. PAINTING, DECORATING, AND PAPER HANGING <br />FOLLOWING MINIMUM STANDARDS: <br />C. WIRING AND ELECTRICAL WORK <br />1. <br />ROADWAY MAINTENANCE: THE OWNER OF THIS <br />D. GLASS AND GLAZING WORK <br />DEVELOPMENT SHALL CLEAN AND MAINTAIN <br />E. DAMP PROOFING AND FIRE PROOFING <br />ALL INTERIOR ROADS AND THEIR INTERSECTION <br />F. TILE, LINOLEUM, FLOOR LAYING, AND OTHER <br />WITH CREEK ROAD TO MINIMIZE THE <br />FLOOR WORK <br />FUGITIVE VE DUST WHICH IS GENERATED BY <br />G. CARPENTRY AND CABINET MAKING AND LUMBER <br />VEHICLES. <br />FACILITY <br />Z. <br />EXCAVATION SHAPE SHALL CONFORM TO THE PLAN AS SHOWN. <br />H. EXCAVATION, WELL DRILLING, MASONRY AND <br />STONE WORK <br />1. PROPANE GAS STORAGE AND SALES <br />4. NEWSPAPER AND DISTRIBUTION CENTER <br />5. MAIL ORDER HOUSE <br />3. <br />AIR QUALITY: ALL ACTIVITIES SHALL MEET APPLICABLE AIR QUALITY <br />6. SEPTIC SYSTEM <br />STANDARDS AS SET BY THE COLORADO AIR QUALITY CONTROL COMMISSION. <br />7. FENCES <br />ANY VIOLATION OF SUCH STANDARDS SHALL BE CERTIFIED TO THE ZONING <br />ADMINISTRATOR BY SAID COMMISSION OR ITS DESIGNATED REPRESENTATIVE <br />B. PERMITTED USES <br />PRIOR TO ENFORCEMENT ACTION BY THE COUNTY CONCERNING SUCH <br />I. MINERAL EXTRACTION OF COMMERCIAL AGGREGATES <br />VIOLATION. CHEMICAL PALLIATIVES ON ALL UNPAVED <br />IS O <br />2. USE IS OPERATION OF A CEMENTACIOUS MATERIAL <br />ROADS AND ON -SITE AREAS USED FOR ACCESS AND SHALL BE WATERED <br />BSE <br />G FACILITY <br />FOR DUST CONTROL AS NECESSARY TO MEET AIR QUALITY STANDARDS <br />3. USE & OPERATION OF CRUSHING & PROCESSING <br />OPERATIONS SHALL BE SUSPENDED DURING PERIODS OF HIGH WINDS <br />EQUIPMENT <br />(30 MPH OR GREATER) OR SUSTAINED TEMPERATURE INVERSIONS (GREATER THAN <br />4. SHOPS FOR CUSTOM WORK (HEAVY INDUSTRIAL) <br />48 HOURS,). A WIND SPEED MEASURING DEVICE IS REQUIRED ON SITE AT ALL TIMES. <br />4. <br />HOURS OF OPERATION: HOURS OF OPERATION FOR OPEN MINING ACTIVITIES <br />SHALL NOT EXCEED 7:00 A.M. TO 7:00 P.M., MONDAY THROUGH SATURDAY. <br />11. DEVELOPMENT STANDARDS <br />5. <br />BLASTING: AIRBORNE NOISE AND SEISMIC DISTURBANCES FROM BLASTING ARE <br />1, MAXIMUM HEIGHT OF STRUCTURES 25', BATCH <br />CONTROLLED BY LIMITING THE QUANTITY OF EXPLOSIVES DETONATED FOR EACH <br />PLANT AND CRUSHERS 60 FT. <br />BLASTING CAP OR FUSE DELAY PERIOD IN EACH SHOT SO THAT THE FOLLOWING <br />A. POST RECLAMATION SETBACKS <br />STANDARDS ARE MET: <br />1. FRONT: 30 FEET <br />ALL BLASTING SHALL BE CONDUCTED IN A MANNER WHICH WILL NOT CAUSE A PEAK PARTICLE <br />2. SIDE: 40 FEET <br />VELOCITY ON ANY ADJACENT OR NEARBY PROPERTY WHICH EXCEEDS .5 INCH PER SECOND. <br />3. REAR: 50 FEET <br />FURTHERMORE, BLASTING SHALL ONLY TAKE PLACE BETWEEN MONDAY AND FRIDAY <br />10:00 AM TO 2:00 PM. IF DUE TO EXTENUATING CIRCUMSTANCES, BLASTING CAN NOT BE <br />B. MINING SETBACKS: <br />CARRIED OUT AT THE ABOVE TIMES PRIOR TO ANY BLAST AT THE QUARRY THE JEFFERSON <br />I. FRONT: (ELK CREEK ROAD): 25 FEET <br />COUNTY SHERIFFS DEPARTMENT AND THE ELK CREEK FIRE DEPARTMENT SHALL BE RE- NOTIFIED <br />2. SIDE: (FACING US HWY 285): 30 FEET <br />OF THE PROPOSED BLAST TIME. QUARRY MANAGEMENT SHALL NOTIFY THE JEFFERSON COUNTY <br />3. REAR: 50 FEET; EXCEPT FOR SOUTHEAST 143 <br />SHERIFFS DEPARTMENT AND THE ELK CREEK FIRE DEPARTMENT. A SEISMOGRAPH WILL BE USED ON <br />FEET <br />EVERY PRODUCTION BLAST. <br />DURING MINING PHASE SETBACKS SHALL <br />DATA FROIM THE BLASTS WILL ALSO BE REQUIRED IN THE ANNUAL REPORT. <br />BE 25' FOOT ON FRONT AND SIDE AND 30 FOOT ON <br />6. <br />NOISE POLLUTION: NO OPERATION SHALL BE CONDUCTED WHICH WILL <br />REAR. <br />PRODUCE A CONTINUOUS VOLUME OF SOUND IN EXCESS OF 70 DECIBELS <br />B A LANDSCAPE BUFFER SHALL BE IMPLEMENTED AROUND <br />ON ADJACENT PROPERTIES NOR A VOLUME OF SOUND GREATER THAN 70 <br />DECIBELS <br />THE BOUNDARY OF THE ODP FOLLOWING COMPLETION <br />BUT LESS THAN 90 DECIBELS UP TO 15 SECONDS IN DURATION <br />ONCE <br />OF THE RECLAMATION ACTIVITIES. REASONABLE <br />7. <br />EACH OPERATING HOUR. <br />ESTIMATED MAXIMUM AVERAGE DAILY NUMBER OF TRUCK TRIPS TO AND FROM <br />ACCESS THROUGH THIS BUFFER SHALL BE ALLOWED <br />THE PROPERTY SHALL BE 190. (190 IN AND 190 OUT). <br />DURING RECLAMATION IN ORDER TO COMPLETE THIS <br />PORTION OF THE WORK. <br />rAnrN/A g,= REV: <br />IuRYE M4Im REV: <br />DRAWN BY: TRF CHW D BY: <br />DATE OF SURVEY: 11/09/05 <br />9937 W. 25TH AVENUE <br />LAKEWOOD, CO 80215 <br />303 - 202 -1560 <br />WWW. FALCONSURVEY%G. COM <br />REV: <br />REV: <br />JJM JOB NO. 20606 <br />20606ODPSHEET2.DWG <br />B. ENFORCEMENT <br />1 . INSPECTIONS: PERIODIC INSPECTIONS OF MINING OPERATIONS MADE <br />BY PERSONNEL FROM THE JEFFERSON COUNTY PLANNING (DEPARTMENT AND <br />ANY OTHER AGENCIES WITH ENFORCEMENT RESPONSIBILITIES CONCERNING REGULA- <br />TION OF ANY ASPECT OF THE MINING OPERATION SHALL BE ALLOWED BY <br />THE OPERATOR. WHEN ANY VIOLATION OF THE PROVISIONS AND TERMS <br />OF THIS OFFICIAL DEVELOPMENT PLAN IS DETERMINED TO EXIST, THE <br />COUNTY SHALL FORTHWITH NOTIFY THE MINED LAND RECLAMATION DIVISION <br />THAT THE OPERATION IS IN VIOLATION OF THIS OFFICIAL DEVELOPMENT PLAN AND <br />SHALL REQUEST THAT THE DIVISION ALSO SUSPEND THE OPERATORS STATE <br />MINING PERMIT, <br />2. ANNUAL REPORT: THE OPERATOR SHALL PREPARE AND SUBMIT TO THE <br />PLANNING AND ZONING DEPARTMENT, AN ANNUAL REPORT WHICH, AS A MINIMUM, <br />SHOULD INCLUDE THE FOLLOWING: <br />A. OPERATIONS: A REPORT IDENTIFYING DAYS OF OPERATION AND IDENTIFYING <br />ALL DAYS ON WHICH THE DETONATION OF BLASTING MATERIAL WITHIN 250 <br />FEET OF THE GROUND SURFACE HAS OCCURRED. <br />B. RECLAMATION: A PROGRESS REPORT ON RECLAMATION IDENTIFYING AREAS <br />BEING RECLAIMED, AREAS IN WHICH RECLAMATION IS COMPLETE, AND THE <br />SUCCESS AND FAILURE OF ALL RECLAMATION EFFORTS TO DATE. <br />C. AIR QUALITY DATA: A REPORT ON ANY VIOLATION OF AIR QUALITY <br />STANDARDS AS DETERMINED BY THE RESPONSIBLE STATE OF COLORADO OR <br />FEDERAL AGENCIES AND THE MANNER IN WHICH SUCH VIOLATIONS WERE <br />RESOLVED. <br />D. PRODUCTION AND TRANSPORTATION: A REPORT ON TRANSPORTATION ACTIVITIES <br />WHICH IS A SUMMARY OF HOW MATERIAL WAS ACTUALLY TRANSPORTED OFF - <br />SITE INCLUDING TRUCK OR OTHER TRIPS AS APPROPRIATE. <br />E. HYDROLOGIC DATA: A REPORT OF HYDROLOGIC DATA WHICH IDENTIFIES <br />ANY IMPACT OF THE OPERATION ON THE HYDROLOGIC CYCLE INCLUDING <br />EROSION AND SEDIMENTATION, SETTLING PONDS, AND ANY STRUCTURES <br />DESIGNED TO ADDRESS THE 100 YEAR FLOOD. <br />F. ANNUAL REPORT: A REPORT ON ANY VIOLATIONS OF ANY APPLICABLE <br />FEDERAL, STATE OR COUNTY STANDARD OR REGULATION CONCERNING <br />AIR, NOISE, OR WATER QUALITY AND THE MANNER IN WHICH SUCH VIOLATIONS <br />WERE RESOLVED SHALL BE SUBMITTED TO THE JEFFERSON COUNTY PLANNING <br />AND ZONING DEPARTMENT IN JULY OF EACH YEAR. <br />III. GENERAL REQUIREMENTS <br />1. EVERY USE SHALL BE OPERATED SO <br />THAT IT DOES NOT <br />EMIT AN OBNOXIOUS OR DANGEROUS <br />DEGREE OF HEAT, <br />GLARE, VIBRATION, DUST, SMOKE, OR <br />FUMES BEYOND <br />THE PROPERTY LINE, <br />2. NO MATERIALS OR WASTES SHALL BE <br />DEPOSITED ON <br />ANY LOT IN SUCH TERM OR MANNER <br />THAT THEY MAY <br />BE TRANSFERRED OFF THE LOT BY NATURAL <br />CAUSES <br />OR FORCES. <br />3. NO MINING ACTIVITY OR TOPOGRAPHICAL <br />ALTERATIONS <br />SHALL OCCUR UNTIL A SITE PLAN IS <br />APPROVED BY <br />THE PLANNING AND ZONING DIVISION. <br />PURSUANT TO THE <br />JEFFERSON COUNTY ZONING RESOLUTION. <br />4. PRIOR TO COMMENCEMENT OF ANY MINING ACTIVITY OR <br />TOPOGRAPHICAL ALTERATIONS, A SITE PLAN MUST BE SUBMITTED <br />TO THE PLANNING AND ZONING DIVISION WHICH DEMONSTRATES <br />THAT THE MINE AND ALL ACCESSORY OPERATIONS WILL COMPLY <br />WITH THE REQUIREMENTS OF THE OFFICIAL DEVELOPMENT PLAN <br />AND OTHER COUNTY REGULATIONS. (ORIG. 6 -1 -93; AM. <br />6- 29 -04) <br />5. THE SITE PLAN OR ACCOMPANYING REPORTS AND <br />DOCUMENTATION SHALL INCLUDE THE FOLLOWING. (ORIG. 6 -1 -93) <br />A. EVIDENCE OF THE EXISTANCE OF A WATER SUPPLY WHICH <br />COMPLIES WITH ALL STATE AND COUNTY LAWS AND REGULATIONS. <br />(ORIG. 6 -1 -93) <br />B. SEWAGE DISPOSAL PROVISIONS WHICH COMPLY WITH ALL <br />STATE AND COUNTY LAWS AND REGULATIONS. (ORIG. 6 -1 -93) <br />C. PROVISIONS FOR ADEQUATE WATER SUPPLY AND EMERGENCY <br />ACCESS FOR FIRE SUPPRESSION AND EVIDENCE OF COMPLIANCE <br />WITH APPLICABLE FIRE CODES. (ORIG. 6 -1 -93) <br />D. A PHASE III DRAINAGE REPORT CONSISTENT WITH THE STORM <br />DRAINAGE DESIGN AND TECHNICAL CRITERIA MANUAL. (ORIG. <br />6- 1- 93;AM.12- 17 -02) <br />E. A PLAN FOR CIRCULATION WHICH DEMONSTRATES COMPLIANCE <br />WITH ALL COUNTY AND STATE HIGHWAY OR ROAD ACCESS <br />REQUIREMENTS. (ORIG. 6 -1 -93) <br />F, EVIDENCE THAT THE AREA WILL BE FREE FROM SUCH <br />RADIATION LEVELS AS THE STATE HEALTH DEPARTMENT HAS <br />DETERMINED TO BE HAZARDOUS TO THE PUBLIC HEALTH. (ORIG. <br />6 -1 -93) <br />G. PLANS CONSISTENT WITH THE REQUIREMENTS OR <br />RESTRICTIONS IN THE OFFICIAL DEVELOPMENT PLAN DEPICTING <br />AREAS TO BE MINED, FENCING, LIGHTING SOURCE AND TYPE, <br />BUILDING LOCATIONS, ACCESS, OUTDOOR STORAGE LOCATIONS AND <br />PROVISIONS, SIGN LOCATIONS, BUFFER AREAS, PROCESS PLANT <br />LOCATION AND SCREENING, STOCKPILE LOCATIONS AND <br />SCREENING, <br />ASSOCIATED MAINTENANCE ROADS, AND OVERHEAD UTILITY LINES. <br />(ORIG. 6 -1 -93) <br />Permit #: IY I`a..i' Confidental ?: <br />class: p,c , •. n Type -Seq.: 5 w C <br />From: To: I�,`kC, <br />Doc. Name: ('I <br />Doc. Date (if no date stamp): L, : ^j c <br />Specialist: (jf <br />CASE 04- 103923RZ <br />MAP # _ 220 & -256 - - -- - - - -- <br />H. RECLAMATION PLANS AND AFTER USE SITE DESIGN PLANS, <br />INCLUDING LANDSCAPING, CONSISTANT WITH THE REQUIREMENTS <br />OF THE OFFICIAL DEVELOPMENT PLAN AND THE COLORADO MINED <br />LAND RECLAMATION BOARD PERMIT. (ORIG. 6 -1 -93) <br />I. A FINAL OPERATIONAL MINE PLAN CONSISTANT WITH THE <br />OFFICIAL DEVELOPMENT PLAN DEPICTING METHOD JF MINING, <br />BENCH ORIENTATION, DIRECTION OF MINING AND CONCURRENT <br />RECLAMATION PLANS. (ORIG. 6 -1 -93) <br />J. DETAILED PLANS FOR ALL MONITORING REQUIRED BY THE <br />OFFICIAL DEVELOPMENT PLAN, INCLUDING THE LOCATION OF <br />MONITORING STATIONS, FREQUENCY OF MONITORING; AND CRITERIA <br />FOR MONITORING. (ORIG. 6 -1 -93) <br />K. ALL STATE AND FEDERAL PERMITS REQUIRED FJR THE MINING <br />OPERATION. (ORIG. 6 -1 -93) <br />DEVELOPMENT PLAN SUMMARY <br />MINING PHASE <br />ALL MINING RECLAMATION WILL BE COMPLETED BY DECEMBER 31, 2020. <br />MAXIMUM WORKING FACE WILL BE LIMITED TO APPROXIMATELY <br />TWO ACRES. <br />THE ACTUAL AGGREGATE EXTRACTION PROCESS WILL COMMENCE AT THE <br />BASE OF THE SITE AND CONTINUE UP THE SLOPE OF THE HILLSIDE WITH <br />8 FOOT WIDE BENCHES AND SLOPE RATIO OF 1/2:1, AS SHOWN ON THE <br />OFFICIAL DEVELOPMENT PLAN. <br />THE FOLLOWING SEED MIXTURE IN POUNDS OF PURE: LIVE SEED PER <br />ACRE WILL BE USED FOR ALL ACRES: <br />RECLAMATION PHASE <br />RECLAMATION WILL BE DONE AS EACH AREA IS EXCAVATED TO <br />ITS FINISH GRADE AND WILL BE A CONTINUOUS PROCESS <br />THROUGHOUT THE MINING OPERATION. TOPSOIL WILL BE <br />PLACED IN 6 TO 12 INCH THICK LAYERS OVER ALL ,AREAS TO <br />BE. REVEGETATED. PRIOR TO SEEDING 40 POUNDS /ACRE OF P205 <br />(PHOSPHATE) AND 30 POUNDS /ACRE OF N (NITROGEN) SHALL BE <br />INCORPORATED INTO THE SOIL PRIOR TO SEEDING. <br />SEED WILL BROADCAST AT THE RATE OF 30 POUNDS PURE LIVE <br />SEED PER ACRE AND WILL BE MULCHED FOR INITIAL EROSION <br />CONTROL WITH NATIVE HAY MULCH AT THE RATE OF 4000 POUNDS/ <br />ACRE AND CRIMPED TO EMBED MULCH. SEEDING WILL BE DONE <br />IN APRIL /MAY OR IN AUGUST /SEPTEMBER. <br />RECLAMATION WILL BE ON A CONTINUOUS PROCESS <br />AFTER AN AREA IS EXCAVATED TO THE FINISHED GRADE. <br />MAXIMUM WORKING FACE WILL BE LIMITED TO APPROKIMATELY <br />NO ACRES. <br />SIIJCE ONE HUNDRED PERCENT OF THE EXCAVATED MATERIAL <br />CAN BE USED, THERE WILL BE NO BACKFILL IN THE EXCAVATED <br />AREA. NO GEOLOGIC HAZARDS PRESENTLY EXIST NCR WILL THERE <br />BE ANY CREATED BY THE PROPOSED MINING OPERATION. <br />PERMANENT SEED MIX <br />30% WESTERN WHEATGRASS - ARRIBA 9.6 # PLS /ACRE, 20% <br />ARIZONA FESCUE - REDONDO 1.8 # PLS /ACRE, 10% HARD FESCUE - <br />DURAR 0.8 # PLS /ACRE, 15% SLENDER WHEATGRASS, PRIMER 3.3 # <br />PLS /ACRE, 15% BLUE GRAMA, LOVINGTON 0.8 # PLS /ACRE, <br />SUNDBURG BLUEGRASS - NATIVE 0.6 # PLS /ACRE. <br />RECEIVED <br />IAN 2 3 2006 <br />