Laserfiche WebLink
Phil Jensen <br />• 9 Oct 97 <br />Page 4 of 18 Pages <br />Enclosure 1 <br />Review of Road Reclamation, Permit C-81-032 <br /> <br />SOURCE (a reference to ~ COMMENT <br />the section of the permit <br />or, as indicated, office <br />files) <br />1.0 Executive Summary Of the entire disturbed area, all except 0.1 acres at the Northern <br />and Introduction # 1 had been released for Phase 1. The 0.1 acres was lefr <br /> outstanding due to a minor slide that had occurred in 1987. <br />Page B-25, 5.1 "The mine (Northern No. 1) was fully reclaimed by October of <br /> 1986" <br />Page B-41, Section 10.0 The only remaining backfilling and grading to be done at the <br />Bonding Information sites involves the removal of two sediment ponds at the Rienau <br /> #2 site after the vegetation is fully established. <br />Page C-29, Section 3.1 Facilities at the Northern No. 1 mine aze identified as a pazking <br /> area, an equipment storage area, a shop building, a coal storage <br /> azea, a water tank, a line for fire protection, an access road, and <br /> an equipment storage pad. <br />Page C-30, Section 3.1.2 Mentions construction of a Class I haul road at the topsoil <br /> stockpile. <br />Page C-43, section 3.5.1 "The Northem No. 1 requires a haul road which runs northerly <br /> from the mine and connects to Colorado State Highway ] 3/789." <br /> Page C-44A "... the landowner has requested that this road <br /> remain after reclamation." <br />Section 13.3.5, page 13- Discuses the haul road to the disposal azea. <br />lla <br />Section 13.5, Page 13-17 A road is an item to be reclaimed. The road is specified as a haul <br /> road on page 13-20 (under Section 13.5.3), and again on page 13- <br /> 22 (under Section 13.5.3.2). <br />Section 13.5.4.4 page 13- Reclamation of road embankments and road drainage ditches is <br />33a discussed. Pazameters apply to haul roads. <br />Enclosure 1 <br />