Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />Task # : 003 State :Colorado Permifrob# : M-1986-061 <br />Date: 11/10/2004 County:LaP/ata Abbreviation :none <br />User: RCO Site:CugniniGravelPit Filename:M061-003 <br />Agency or organization name : DMG <br />Permit or other job action :Amendment AM-O7 <br />Task description :Reduce highwall in South Pit Mining Area 5 <br />HOURLY EpU1PMENT COST <br />Cost Breakdown <br />MATERIAL pUANTITIES <br />Initial <br />volume : 6,300 <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />OwnershipcosUhour : $51.01 NA <br />OperatingcosUhour : $93.54 100 <br />Ripper op.cosVhour : $0.00 0 <br />Operator cosVhour : $31.76 NA <br />Total unit cosUhour : $176.31 Total fleet cosVhour : $176.31 <br /> <br />Swell Loose <br />BCY factor : 1.330 volume : 8,379 LCY <br />Source of estimated volume :850 LF x 40 ft ht ~ 1: 1, <br />Source of estimated swell factor ;program <br />HOURLY PRODUCTION <br />Average push distance : 60 feet <br />Unadjusted hourly production : 1,872.0 LCY/hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Decomposed rock - 50% Rock, <br />30.00 % (i <br />6,600 feet <br />2,900 Ibs/LCY <br />50% Earth <br />to 2:1 <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.60 <br />Altitutle : 1.00 <br />Material weight : 0.79 <br />Blade type : 1.00 <br />Net correction : 0.57 <br />Adjusted unit production <br />Adjusted fleet production <br />Source <br />f065. f8 LCY/hr <br />1,065.18 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 7.87 <br />Unit cost : $0.166 /LCY Total job cost : $1,387 <br />Hours <br />