Laserfiche WebLink
<br />TABLE OF CONTENTS <br />TITLE SHEET . 1 <br />TABLE OF CONTENTS 2 <br />PART I. AUTHORIZATION TO CONSTRUCT AND INJECT 4 <br />PART II. SPECIFIC PERMIT CONDITIONS 6 <br />A. WELL CONSTRUCTION REQUIREMENTS 6 <br /> 1. Casing and Cementing for Pilot Project 6 <br /> 2. Casing and Cementing for Commercial Project 6 <br /> 3. Tubing and Packer Specifications 6 <br /> 4. Monitoring Devices 6 <br /> 5. Proposed Changes and Workovers 7 <br /> 6. Logging Specifications 8 <br /> 7. Postponement of Construction 8 <br />B. CORRECTIVE ACTION 8 <br />C. WELL OPERATION 9 <br /> 1. Pilot Project Operations 9 <br /> 2. Prior to Commencing Injection 10 <br /> 3. Concurrent with Commencement of Injection 10 <br /> 4. Mechanical Inte rit Subse uent to Initial <br /> Demonstration <br />. 10 <br /> 5. Injection Interval 12 <br /> 6. Injection Pressure Limitation 12 <br /> 7. Injection Volume Limitation 13 <br /> 8. Injection Fluid Limitation 13 <br /> 9. Annular Fluid 13 <br />D. MONITORING, RECORDREEPING, AND REPORTING OF <br /> RESULTS 13 <br /> 1. In ection Well Monitoring Program 13 <br /> 2. Monitoring Well Program 15 <br /> 3. Monitoring Information i7 <br /> 4. Recordkeeping 17 <br /> 5. Reporting of Results 18 <br />E. PLUGGING P.,ND ABANDONMENT 18 <br /> 1. Notice of Plugging and Abandonment 18 <br /> 2. Plugging and Abandonment Plan 18 <br /> 3. Cessation of Injection Activities 18 <br /> 4. Plugging and Abandonment Report 19 <br />F. FINANCIAL RESPONSIBILITY 19 <br /> 1. Demonstration of Financial Responsibility 19 <br /> 2. Insolvency of Financial Institution 20 <br /> 3. Cancellation of Demonstration of Financial <br /> Institution 20 <br />PART III. GENERAL PERMIT CONDITIONS 21 <br />A. EFFECT OF PERMIT 21 <br />B. PERMIT AC'T'IONS 21 <br />1. Modification, Reissuance, or Termination 21 <br />Page 2 of 61 <br />EPA Permit No. COS2358-0696 <br />