Laserfiche WebLink
<br />Stipulation No. 3 Description <br /> <br />Future quarrying under the Phase II mining plan, which is approved for benches and steep highwalls as part of the <br />final reclaimed surfaces, must be performed so as [o ensure long term stability, especially in the vicinity of the <br />final pit wall. The operation must be carried out with respect to preserving intact any rock bridges along adverse <br />fracture orientations. If unstable or adverse rock conditions are discovered during excavation, the operator must <br />inquire to the Division as to the need for committing to a perimeter blasting plan, which would employ alternate <br />blasting practices to protect the integrity of remaining rock and intact rock bridges, or other appropriate <br />alternatives to the presently approved plan. <br />The estimated Lability amount of $45,461.00 for the Dickerson Pi[, when added to the existing liability amount of <br />$13,300.00, exceeds the performance bond held If you have no[ already done so, please submit additional bond in the <br />amount of $45,461.00, for a total required bond of $58,761.00. The revision will no[ be fnal until the bond is approved <br />by the Division. <br />If you have any questions, please contact me. <br />Sincerely, , <br />r -~.~ ~ <br />CZ~ ~,8ob OSWaId <br />Environmental Protection Specialist <br />cc: Suzi Ericksen, DMG <br />M:bss6ME\TEMPM-RV-O? h119763U5 1C5 ]00101?i 3575a PM.d« <br />