Laserfiche WebLink
<br />-iii- <br />The Colorado State Historical Preservation Office regarding properties of historical significance including the need for an <br />azcheological survey, procedures for requesting a 51e search, and inventory forms to identity stmctures. <br />Colorado Division of Water Resources with regard to the administration of water rights; <br />Colorado Department of Health, Water Quality Control Division, with regard to the discharge of pollutants into the waters of the <br />State; <br />Colorado Department of Health, Air Pollution Control Division, with regazd to the need for a fugitive dust permit; <br />U.S. Bureau of Land Management or the U.S. Forest Service if the proposed operation will occur on federal lands; <br />U. S. Army Corps of Engineers regarding a dredge and fill (404) permit and <br />Tbe County Planning Department for the county or counties in which yotn proposed operation is looted. Section 34-32-109(6), <br />C.RS. requires a mining operator to be responsible for assuring that the mining operation and the post-mining land use comply <br />with local land use regulations and atry master plan for extraction adopted pursuant to Section 34-1-304, C.RS. <br />PFRMiT APPRAVAi e <br />An applicant wilt not be issued a reclamation permit until notified by the Office that this appliotion and the required performance <br />and financial warranties have been approved. Alternatively, an automatic approval will oavr where the Office fails to notify the <br />appliont/operator that the application has been denied. This decision must be made thirty (30) calendar days from the date the <br />application was submitted. However, the performance and financial warranties must be submitted and approved by the Office before <br />the permit will be issued even if you receive an automatic approval. NO MINING OPERATIONS SHALL BEGIN UNTQ. A <br />PERMIT IS ISSUED (Rule 4.1(2)). <br />Within ten (10) days after filing, mail or personally serve a copy of the notice described in Rule 1.6.2(1)(c) to all owners of record of <br />surface rights to the affected land and all owners of record of lands that are within 200 feet of the boundary of the affected land <br />(Rule 1.6.2(1)(d)(i) and (ii). In addition, you must publish once in a newspaper of general circulation, in the locality of the proposed <br />mining opemtion, the notice described in Rule 1.6.2(1)(c). A copy of a form which includes all required information for the notice <br />has been attached for your use. You will need to provide the Office proof of notice prior to We decision date. Proof of notice may be <br />by submitting return receipts of a certified mailing or by proof of personal service (Rules 1.4.1(4), 1.4.2(4)(c) and 1.6.2(1)(d)). <br />NnTir Tn ~oMMFHTnucinaiFC^mRC~ <br />It is likely there will be additions, changes, and deletions to this document prior to final decision by the Office. Therefore, if you <br />have arty comments or concerns you must contact the applicant or the Office prior to the decision date so that you will know what <br />changes may have been made to the application document. <br />The Office is not allowed to consider comments, unless they are written, and received prior to the end of the public comment period. <br />You should contact the applicant for the final date of the public comment period. <br />If you have questions about the Mined Land Reclamation Board and Office review and decision or appeals process, you may contact <br />the Office at (303) 866-3567. <br />Upon completion of any phase of reclamation, you should consult Rule 3.1 for reclamation standards and 4.16 for details on how to <br />request a reclamation responsibility release from the Boazd. <br />M:Yninlshaie\vsfrnmsVtardraic110.doc (07/24Y2003) <br />