Laserfiche WebLink
<br />Significant impacts to adjudicated water rights within or adjacent to the Permit Area are <br />• not anticipated. No water sources or storage or conveyance structures will be disturbed <br />or directly impacted by gravel extraction operations. Off-site quantities and quality of <br />streamflow will be preserved through proper construction, operation, and maintenance of <br />diversion structures and sedimentation ponds. The areas to be disturbed contain limited <br />shallow ground water, so potential impacts to springs or wells outside the disturbed area <br />are not anticipated. SCC will, to the extent operationally feasible, discharge pit pumpage <br />to the drainage basin corresponding to the water source location and has designed the <br />postmining topographic configuration to reestablish premining drainage area boundaries <br />to the extent reasonably feasible. <br />• <br />• <br />G-12 Revised May 1998 <br />