Laserfiche WebLink
TATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St, Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8663567 <br />FAX: (303) 832-8106 <br />January 27, 2006 >/ <br />Mr. Tim Haynes <br />Climax Molybdenum Company <br />19302 County Road 3 <br />Parshall, CO 80468 <br />RE: /. Environmental Protection <br />`~ G 5 <br />~~ _ , [ / <br />`I COLORADO <br />DIVISION OF <br />MINERALS <br /> <br /> GEOLOGY <br /> RECLANATION•NINING <br />EAFETT•ECIENCE <br />-Mill Water Barge System, <br />Henderson Mill, Permit No. M-1977-342 <br />Dear Mr. Haynes: <br />ein owem <br />Governor <br />Russell George <br />Ezecu[ive Director <br />Ronald W. carony <br />Division Dileaor <br />Natural Resource Trustee <br />Thank you for your letter dated January 27, 2006 and attached certification for the new bazge and <br />pipeline system that has been installed to deliver tailing pond water to Henderson Mill. In the <br />attachment, Steven M. Maly, a registered professional engineer with W.W. Wheeler and Associates, <br />certifies that the new facilities have been constructed in general conformance with the original design <br />plans and specifications, and that the start-up, testing, and de-bugging process is set to begin. <br />The certification provided meets the requirements of Rule 7.3 of the Mineral Rules and Regulations of <br />the Mined Land Reclamation Boazd. In accordance with Rules 7.3.1(5) and 7.3.2(3), the Division of <br />Minerals and Geology (DMG) hereby accepts the certification of the Mill Water Barge System. With <br />this acceptance, Henderson may put the new facilities into service. As a condition of this acceptance, a <br />copy of the final project report including as-builts and all testing data must be provided to DMG before <br />June 1, 2006. If any problems develop with the meeting of this deadline, please contact me in advance. <br />DMG would like to take this opportunity to congratulate Henderson on the successful construction of <br />this substantially upgraded Environmental Protection Facility. <br />If you have any questions, please contact me at 303/866-4063. <br />Sincer ly, <br />/~ <br />Allen C. Sorenson <br />Reclamation Specialist <br />cc: Cazl Mount, DMG (via email) <br />Hany Posey, DMG (via email) <br />Bruce Humphries, DMG (via email) <br />c:~Documents and SeltingsWCSVvfy DocumentsVlenderson ntill water barge system cerlification.doc <br />Office of C~ce of Colorado <br />Mined Land Reclamation Active and Inactive Mines Geological Survey <br />