Laserfiche WebLink
<br />E:fHIBIT E <br />SN RECLAMATION PLAN <br />Overview <br />' Intensive reclamation efforts are now successfully <br />' underway in previously mined areas of the Morrison Quarry. <br />The objectives of the proposed reclamation plan are to <br />' stabilize the mined land and to restore the area to a state <br />which approximates its condition prior to disturbance of <br />r the area. The operator intends to reclaim the site as open <br />space which will provide wildlife habitat. The land will be <br />recontoured and revegetated with species well-adapted to the <br />ecological characteristics of the site. <br />The plan for creation of open space and wildlife <br />habitat is appropriate within the context of the surrounding <br />land uses and is compatible with applicable Jefferson County <br />zoning. <br />A description of the site conditions following <br />mining, and a discussion of the reclamation plan as it was <br />' originally approved, appear on the following pages. <br /> <br /> <br /> <br /> <br />E-1 <br />