Laserfiche WebLink
a <br />0 <br />0 <br />0 <br />0 <br />s <br />URBAN DRAINAGE AGREES NOT TO WITHHOLD CONSENT TO <br />CONSIDER OTHER VIABLE OPTIONS FOR EROSION <br />PROTECTION SHOULD THEY BECOME AVAILABLE PRIOR TO <br />♦♦ �.� CONSTRUCTION OF THE FACILITIFS HEREIN. <br />DFA7 � �' ♦` ��'�- ' ♦♦ <br />Q100 = 482cfs s ♦ ♦, <br />( KIOWA ENGINEERING) I PROPOSED 110' �♦ , , <br />4 DROP LONG x 130' <br />i 5TRUCTURf S WIDE SPILLWAY <br />SEE NOTE ) ELEV. 4975.0 <br />1 <br />' I � PROPOSED 60' NORTH LAKE � <br />° WIDE RUNDOWN (36 AC) a' _ <br />i <br />CHANNEL I z <br />7 DRgP 1. `. PROPOSED 5' 1w w <br />1. STRUCTURES 3 ' <br />/ WIDE. RUNDOWN o <br />2 / (SEE NOTF� 6) CHANNEL S~ <br />BANK `e <br />DFA 6 -- -- <br />' ' <br />r Q100 = 58cfs / •k / FROM UDFCD <br />I ( KIOWA ENGINEERING) <br />CARLSON <br />C EASEMENT; ' <br />PROPOSED 110 / <br />r u . <br />LONG 'x .300' <br />WIDE SPh-LWAY = '� <br />ELEV. 4978.0 r" ,�•. <br />, <br />APPROXIMATE 2 . <br />100=YR <br />FLOODPLAIN <br />DFA 5 <br />CENTRAL ' <br />' Q100 = 304cfs RESERVOIR <br />, TOWER .- B' , <br />( KIOWA ENGINEERING) (83 AC) EASEMENT j <br />4, <br />�\ APPROXIMATE <br />X10 YR ,try 100 -YR <br />FLOODWAY Q� FLOODWAY <br />NORTHWEST i RELOCATED ` <br />CORNER, y PIPELINE, aT TOP OF w <br />SECTION 23 / t BANK ' <br />, <br />._ J Q <br />IN. 100. • - - - -- - - - -- -- - - - -- <br />- - — - — <br />13ERM PROPOSED „ - <br />• LATERAL. BE RM. , <br />\P T r DOWNSTREAM <br />PROTECTIOt, ; <br />M i �p EXISTING <br />i <br />LAKE <br />OIL <br />REVEGETATED / <br />DFA 4 SURFACE <br />0100 = 813cfs <br />M - <br />( KIOWA ENGINEERING) <br />SOUTH <br />184 <br />.98 ac RESERVOIR- <br />(77 I ' <br />, ... ,.. <br />PROPOSED .100' PROPOSED <br />BRANTNER / WIDE RUNDOWN BANK / <br />CHANNEL STABILIZATION PROPOSED 110° LONG <br />IRRIGATION / I �;I x 250' WIDE SPILLWAYk <br />DITCH ,; ELEV. 4986.5 APPROXIMATE <br />s 100 -YR <br />N <br />f r; FLOODPLAIN <br />BANK <br />STABILIZATION " (` <br />FROM UDFCD �., <br />a�� , GOETZ I <br />1 EASEMENT <br />EXISTING <br />e j LAKE <br />t PROPOSED \ <br />BANK i <br />STABILIZATION <br />,- <br />40P % TOWER t 1 <br />LAKE 1 <br />000 "� EASEMENT. <br />400 200 0 400 800 1200 <br />SCALE IN FEET <br />PIT SIDE <br />100' <br />UDFCD <br />SETBACK <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />RIVERSIDE <br />4 1.75 X 1.00' <br />1 D50 <br />2 -YR WATER SURFACE <br />3.0 X 3.00' <br />D50 MIN. <br />RIVER It <br />5.00' 1 <br />MIN. <br />100•' <br />TYPE L MIN. <br />RIPRAP <br />TYPICAL RIVERSIDE PROTECTION DETAIL <br />18" (MIN.) <br />GROUTED <br />BOULDERS <br />PIT INVVERT <br />100' SETBACK OPTION <br />NTS <br />PIT SIDE <br />MAINTENANCE <br />ACCESS TRAIL <br />TOP OF RIVERSIDE BERM <br />15.00' <br />3 IN <br />- I �►— <br />1 0.00' I <br />5.00' 1 <br />DCWNSTREAM II � 100' UPSTREAM <br />OIT \InouAI t� MINIMUM, <br />BEDDING AND FILTER <br />LATERAL BERM PROTECTION DETAIL <br />PIT SIDE <br />NTS <br />200' <br />UDFCD <br />SETBACK <br />RIVER INVERT <br />TYPICAL RIVERSIDE PROTECTION DETAIL <br />200' SETBACK OPTION <br />NTS <br />CONCRETE RIVERSIDE <br />CUTOFF WALLS, <br />4000 psi <br />1.75 X <br />D50 <br />5 -YR FLOOD ELEVATION <br />E. VLULIAILU— Lj 4 Q;VT �N— <br />1 I 3.00' <br />1 100' MAX. <br />X <br />3.00' D50 � <br />TYPE M RIPRAP <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />TYPICAL SIDE- CHANNEL <br />SPILLWAY CROSS SECTION <br />NTS <br />CONSTANT SPILLWAY <br />SIDE SLOPE <br />1 <br />VEGETATED <br />SIDE CHANNEL SPILLWAY <br />CENTER CROSS SECTION <br />NTS <br />ZIVER;C'VERT 1 <br />2.5 <br />1 5.00' <br />MAINTENANCE <br />ACCESS TRAIL <br />EXISTING CONCRETE CUTOFF WALL <br />GROUND (4,000 psi) <br />3 18" (MIN.) <br />GROUTED <br />5.00' �1 BOULDERS <br />3 <br />1 2' —{ — 3.00' µ" "a r • . <br />PIT I <br />18" (MIN.) GROUTED <br />BOULDERS <br />CROSS SECTION PROFILE <br />TYPICAL RUNDOWN CHANNEL for OFFSITE FLOWS <br />NTS <br />ADDITIONAL NOTES: <br />I. RECONSTRUCTED DRAWING FROM ORIGINAL BANKS AND <br />GESSO DRAWING, 3/21/2000 <br />2. EASEMENT BOUNDARIES OBTAINED FROM FILES PROVIDED BY <br />UDFCD. BOUNDARIES LOCATED WITH AS MUCH ACCURACY <br />AS POSSIBLE WITH INFORMATION GIVEN. <br />3. MINIMUM SETBACKS ARE SHOWN ASSUMING FULL RIVERSIDE <br />BANK PROTECTION. IF RIVERSIDE BANK PROTECTION IS NOT <br />CONSTRUCTED, MINIMUM SETBACKS WILL BE 300'. <br />PIT SIDE SLOPE <br />,IVERT—k <br />3.00' <br />4. RUNDOWN CHANNEL LOCATIONS ARE APPROXIMATED <br />ACCORDING TO STUDY DONE BY KIOWA ENGINEERING. <br />LOCATIONS MAY VARY DEPENDING ON WHERE OFFSITE <br />FLOWS ARE ROUTED. <br />5. ALL PRiOTECTED AREAS MAY CONTAIN RIPRAP WITH <br />VEGETAIFION ABOVE THE ORDINARY HIGII WATER LINE IN <br />ACCORDANCE WITH SECTION 2.3.2 OF UDFCD GRAVEL <br />MINING TECHNICAL GUIDELINES, 1987. <br />NOTE: <br />O1 POTENTIAL WETLAND AREAS ARE FROM IRRIGATION <br />TAILWATERS. IRRIGATION WATER WILL BE CUT OFF <br />AND THESE AREAS WILL DRY OUT. <br />OUNDISTURBED WETLAND AREAS <br />3.00' d U <br />MIN. z m <br />I <br />1 Q W <br />I <br />I �a <br />aI as I� <br />Ed d <br />z ow.c a <br />°Im a'i m~ <br />ccmom ;u <br />LEGEND <br />PERMIT AMENDMENT BOUNDARY <br />- - - - - -- SECTION LINE <br />—� SHORE LINE <br />TOPO CONTOUR <br />ROAD PAVED <br />-------- _ ROAD UNPAVED <br />--- - - - -'— E -470 ALIGNMENT <br />RIVER <br />DITCH <br />—P —P — UNDERGROUND PIPE LINE <br />CLAY LINED AREAS <br />SLURRY WALL <br />WETLAND /WILDLIFE HABITAT <br />WATER STORAGE RESERVOIR <br />NATIVE GRASS & SHRUBS <br />NATIVE TREES AND BRUSH <br />UNDISTURBED VEGETATION <br />'- •-- '- •---- '- • - - - -• EXISTING EASEMENTS <br />° = 100 -YR FLOODPLAIN <br />•° *w m 100 -YR FLOODWAY <br />H <br />IL <br />RIVERSIDE <br />0 0 <br />O <br />; <br />I I <br />1.00' <br />� <br />N d <br />w, <br />I 11 <br />2 -YR WATER SURFACE <br />r G <br />r <br />Q <br />L a <br />� <br />Q <br />qo <br />v <br />>. <br />m <br />0 <br />_ M <br />1♦ <br />L <br />m <br />O <br />y <br />o 5 <br />14 <br />3 <br />v o0 <br />3 <br />O <br />a <br />ii <br />U <br />N <br />CL <br />O <br />L <br />J <br />v <br />a <br />Q <br />m <br />a <br />� <br />N <br />O <br />z <br />Q m � <br />Job No: 01 -L02 <br />DI Iwn -. ? DBL <br />_ <br />c II eked <br />- - <br />s,aic 1 " -400. <br />N <br />o- <br />4 4 <br />o 'c yNj <br />,P <br />U <br />U <br />� Q `✓w v <br />RIVER INVERT <br />TYPICAL RIVERSIDE PROTECTION DETAIL <br />200' SETBACK OPTION <br />NTS <br />CONCRETE RIVERSIDE <br />CUTOFF WALLS, <br />4000 psi <br />1.75 X <br />D50 <br />5 -YR FLOOD ELEVATION <br />E. VLULIAILU— Lj 4 Q;VT �N— <br />1 I 3.00' <br />1 100' MAX. <br />X <br />3.00' D50 � <br />TYPE M RIPRAP <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />TYPICAL SIDE- CHANNEL <br />SPILLWAY CROSS SECTION <br />NTS <br />CONSTANT SPILLWAY <br />SIDE SLOPE <br />1 <br />VEGETATED <br />SIDE CHANNEL SPILLWAY <br />CENTER CROSS SECTION <br />NTS <br />ZIVER;C'VERT 1 <br />2.5 <br />1 5.00' <br />MAINTENANCE <br />ACCESS TRAIL <br />EXISTING CONCRETE CUTOFF WALL <br />GROUND (4,000 psi) <br />3 18" (MIN.) <br />GROUTED <br />5.00' �1 BOULDERS <br />3 <br />1 2' —{ — 3.00' µ" "a r • . <br />PIT I <br />18" (MIN.) GROUTED <br />BOULDERS <br />CROSS SECTION PROFILE <br />TYPICAL RUNDOWN CHANNEL for OFFSITE FLOWS <br />NTS <br />ADDITIONAL NOTES: <br />I. RECONSTRUCTED DRAWING FROM ORIGINAL BANKS AND <br />GESSO DRAWING, 3/21/2000 <br />2. EASEMENT BOUNDARIES OBTAINED FROM FILES PROVIDED BY <br />UDFCD. BOUNDARIES LOCATED WITH AS MUCH ACCURACY <br />AS POSSIBLE WITH INFORMATION GIVEN. <br />3. MINIMUM SETBACKS ARE SHOWN ASSUMING FULL RIVERSIDE <br />BANK PROTECTION. IF RIVERSIDE BANK PROTECTION IS NOT <br />CONSTRUCTED, MINIMUM SETBACKS WILL BE 300'. <br />PIT SIDE SLOPE <br />,IVERT—k <br />3.00' <br />4. RUNDOWN CHANNEL LOCATIONS ARE APPROXIMATED <br />ACCORDING TO STUDY DONE BY KIOWA ENGINEERING. <br />LOCATIONS MAY VARY DEPENDING ON WHERE OFFSITE <br />FLOWS ARE ROUTED. <br />5. ALL PRiOTECTED AREAS MAY CONTAIN RIPRAP WITH <br />VEGETAIFION ABOVE THE ORDINARY HIGII WATER LINE IN <br />ACCORDANCE WITH SECTION 2.3.2 OF UDFCD GRAVEL <br />MINING TECHNICAL GUIDELINES, 1987. <br />NOTE: <br />O1 POTENTIAL WETLAND AREAS ARE FROM IRRIGATION <br />TAILWATERS. IRRIGATION WATER WILL BE CUT OFF <br />AND THESE AREAS WILL DRY OUT. <br />OUNDISTURBED WETLAND AREAS <br />3.00' d U <br />MIN. z m <br />I <br />1 Q W <br />I <br />I �a <br />aI as I� <br />Ed d <br />z ow.c a <br />°Im a'i m~ <br />ccmom ;u <br />LEGEND <br />PERMIT AMENDMENT BOUNDARY <br />- - - - - -- SECTION LINE <br />—� SHORE LINE <br />TOPO CONTOUR <br />ROAD PAVED <br />-------- _ ROAD UNPAVED <br />--- - - - -'— E -470 ALIGNMENT <br />RIVER <br />DITCH <br />—P —P — UNDERGROUND PIPE LINE <br />CLAY LINED AREAS <br />SLURRY WALL <br />WETLAND /WILDLIFE HABITAT <br />WATER STORAGE RESERVOIR <br />NATIVE GRASS & SHRUBS <br />NATIVE TREES AND BRUSH <br />UNDISTURBED VEGETATION <br />'- •-- '- •---- '- • - - - -• EXISTING EASEMENTS <br />° = 100 -YR FLOODPLAIN <br />•° *w m 100 -YR FLOODWAY <br />H <br />IL <br />RIVERSIDE <br />a <br />; <br />I I <br />1.00' <br />49 <br />I 11 <br />2 -YR WATER SURFACE <br />J LL I� <br />111 <br />RIVER INVERT <br />TYPICAL RIVERSIDE PROTECTION DETAIL <br />200' SETBACK OPTION <br />NTS <br />CONCRETE RIVERSIDE <br />CUTOFF WALLS, <br />4000 psi <br />1.75 X <br />D50 <br />5 -YR FLOOD ELEVATION <br />E. VLULIAILU— Lj 4 Q;VT �N— <br />1 I 3.00' <br />1 100' MAX. <br />X <br />3.00' D50 � <br />TYPE M RIPRAP <br />6" TYPE II GRANULAR <br />BEDDING AND FILTER <br />TYPICAL SIDE- CHANNEL <br />SPILLWAY CROSS SECTION <br />NTS <br />CONSTANT SPILLWAY <br />SIDE SLOPE <br />1 <br />VEGETATED <br />SIDE CHANNEL SPILLWAY <br />CENTER CROSS SECTION <br />NTS <br />ZIVER;C'VERT 1 <br />2.5 <br />1 5.00' <br />MAINTENANCE <br />ACCESS TRAIL <br />EXISTING CONCRETE CUTOFF WALL <br />GROUND (4,000 psi) <br />3 18" (MIN.) <br />GROUTED <br />5.00' �1 BOULDERS <br />3 <br />1 2' —{ — 3.00' µ" "a r • . <br />PIT I <br />18" (MIN.) GROUTED <br />BOULDERS <br />CROSS SECTION PROFILE <br />TYPICAL RUNDOWN CHANNEL for OFFSITE FLOWS <br />NTS <br />ADDITIONAL NOTES: <br />I. RECONSTRUCTED DRAWING FROM ORIGINAL BANKS AND <br />GESSO DRAWING, 3/21/2000 <br />2. EASEMENT BOUNDARIES OBTAINED FROM FILES PROVIDED BY <br />UDFCD. BOUNDARIES LOCATED WITH AS MUCH ACCURACY <br />AS POSSIBLE WITH INFORMATION GIVEN. <br />3. MINIMUM SETBACKS ARE SHOWN ASSUMING FULL RIVERSIDE <br />BANK PROTECTION. IF RIVERSIDE BANK PROTECTION IS NOT <br />CONSTRUCTED, MINIMUM SETBACKS WILL BE 300'. <br />PIT SIDE SLOPE <br />,IVERT—k <br />3.00' <br />4. RUNDOWN CHANNEL LOCATIONS ARE APPROXIMATED <br />ACCORDING TO STUDY DONE BY KIOWA ENGINEERING. <br />LOCATIONS MAY VARY DEPENDING ON WHERE OFFSITE <br />FLOWS ARE ROUTED. <br />5. ALL PRiOTECTED AREAS MAY CONTAIN RIPRAP WITH <br />VEGETAIFION ABOVE THE ORDINARY HIGII WATER LINE IN <br />ACCORDANCE WITH SECTION 2.3.2 OF UDFCD GRAVEL <br />MINING TECHNICAL GUIDELINES, 1987. <br />NOTE: <br />O1 POTENTIAL WETLAND AREAS ARE FROM IRRIGATION <br />TAILWATERS. IRRIGATION WATER WILL BE CUT OFF <br />AND THESE AREAS WILL DRY OUT. <br />OUNDISTURBED WETLAND AREAS <br />3.00' d U <br />MIN. z m <br />I <br />1 Q W <br />I <br />I �a <br />aI as I� <br />Ed d <br />z ow.c a <br />°Im a'i m~ <br />ccmom ;u <br />LEGEND <br />PERMIT AMENDMENT BOUNDARY <br />- - - - - -- SECTION LINE <br />—� SHORE LINE <br />TOPO CONTOUR <br />ROAD PAVED <br />-------- _ ROAD UNPAVED <br />--- - - - -'— E -470 ALIGNMENT <br />RIVER <br />DITCH <br />—P —P — UNDERGROUND PIPE LINE <br />CLAY LINED AREAS <br />SLURRY WALL <br />WETLAND /WILDLIFE HABITAT <br />WATER STORAGE RESERVOIR <br />NATIVE GRASS & SHRUBS <br />NATIVE TREES AND BRUSH <br />UNDISTURBED VEGETATION <br />'- •-- '- •---- '- • - - - -• EXISTING EASEMENTS <br />° = 100 -YR FLOODPLAIN <br />•° *w m 100 -YR FLOODWAY <br />H <br />0 <br />Z <br />Q <br />uj <br />2 <br />49 <br />Q <br />c <br />CC <br />0 <br />Q <br />W <br />0 <br />Q <br />0 <br />v <br />>. <br />m <br />0 <br />Z <br />Q <br />14 <br />0 <br />Z <br />v <br />O <br />a <br />N <br />U <br />a <br />� <br />0 <br />Q <br />m <br />a <br />z <br />0 <br />a <br />K <br />U <br />U) <br />w <br />0 <br />,r,. <br />:'1 :: <br />6. BECAUSE OF POSSIBLE CHANGES TO THE MINING PLAN <br />DUE TO UNFORESEEN CONDITIONS, THE ENGINEER WILL <br />DECIDE THE FINAL LOCATIONS OF THE CHANNELS AND Short: <br />DROP STRUCTURES AT THE TIME OF CONSTRUCTION, TO <br />BE APPROVED BY URBAN DRAINAGE. <br />0I: <br />1 <br />0 <br />a <br />m <br />w <br />0 <br />0 <br />z <br />Date- 06/28/01 <br />Job No: 01 -L02 <br />DI Iwn -. ? DBL <br />_ <br />c II eked <br />- - <br />s,aic 1 " -400. <br />6. BECAUSE OF POSSIBLE CHANGES TO THE MINING PLAN <br />DUE TO UNFORESEEN CONDITIONS, THE ENGINEER WILL <br />DECIDE THE FINAL LOCATIONS OF THE CHANNELS AND Short: <br />DROP STRUCTURES AT THE TIME OF CONSTRUCTION, TO <br />BE APPROVED BY URBAN DRAINAGE. <br />0I: <br />1 <br />0 <br />a <br />